Laserfiche WebLink
.0 BP il Facility # 01476, Tracy <br />QI I , I " 11�11 ij-ii� 11, 1, 1 1 <br />N11111-1.1 1&0* 1,•llafi• <br />Ifluf VUT&1AT*"PWWU*6 s shall <br />be kept at the Tosco Northwest Office for at least 3 years. Records of leaks or <br />suspected leaks and the required investigations shall also be kept at the Tosco <br />Northwest Office for 3 years. <br />The facility will follow the procedures in the Business Response Plan included with the <br />Hazardous Material Business Plan. A summary of the procedures that shall bt- <br />followed by all personnel in the event of a leak or a suspected leak is provided below. <br />1. Facility personnel shall notify the manger/owner immediately if a leak is <br />suspected. <br />2. Facility personnel shall notify the manager/owner immediately if the <br />continuous monitoring device sounds and/or manual inventory <br />reconciliation identifies the possibility of a release. <br />3. The manager/owner shall determine whether a leak has occurred or the <br />monitoring device has malfunctioned. <br />4. If the leak detection system has malfunctioned, the manager/owner shall <br />immediately notify the Tosco Maintenance Department. <br />5. If a leak is suspected, the manager/owner shall contact the Toscit, <br />Maintenance Department for investigation and corrective action. <br />6. In the event of a substantial release of more than 5 gallons, the <br />manager/owner shall notify Tosco's Maintenance Department and/or <br />Environmental Department immediately so that notification can be made <br />to the appropriate local agency. A report including confirming <br />procedures shall be completed within 24 hours. <br />7. The Tosco Maintenance Department shall respond to a reported leak <br />immediately. <br />?,. The leaking tank shall be excavated, repaired, or replaced. <br />9. Appropriate soil and groundwater investigations will commence, if <br />necessary. <br />2869M46.wPb 3 <br />