My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2300 - Underground Storage Tank Program
>
PR0231401
>
COMPLIANCE INFO_1988-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:48:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2004
RECORD_ID
PR0231401
PE
2361
FACILITY_ID
FA0006388
FACILITY_NAME
KWIK SERVE
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
01
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231401_950 W ELEVENTH_1988-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
566
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 31, 1988 <br />Desert Petroleum Inc., <br />John Rutherford <br />P 0 Box 1601 <br />Oxnard, CA 93032 <br />RE: Monitoring Alternative #6 and Removal of Waste Oil Tank <br />Implementation of monitoring alternative #6 requires the following <br />information to be submitted to the San Joaquin Local Health District: <br />1. Submit a permit application with the workplan and proposal for <br />all vadose monitoring wells. <br />2. Verify the presence of sand or pea gravel backfill for the vadose <br />monitoring devices. <br />3. Verify the vadose zone by documenting the distance between the <br />bottom of the tank and the ground water. <br />4. Include the soil and ground water sampling on the vadose monitoring <br />well installation proposal. <br />5. If there is any contamination identified on the initial soil sample <br />then a full site assessment must be performed and remediation alternative <br />proposed. (Tani: removal maybe required as part of remediation). <br />Permanent closure requirements shall apply to waste oil tanks where <br />the storage of hazardous substances has ceased and where the owner <br />has no intent within the next two (2) years of using this tank. Enclosed <br />you will find a closure packet. <br />If you have any questions contact Jaime Favila, R.S. of my staff at <br />(209)468-3440 between the hours of 8-9 AM Monday through Friday. <br />Jogi Khanna, M.D., MPH <br />District <br />P111lth Officer <br />/Roti Valino .' R.S. Director <br />Environmental Health Division <br />RV/JF:jw <br />BOARD OF TRUSTEES <br />SV JOAQUIN LOCAL HEALTH DIS"PI~iICT <br />SERVING <br />James Culbertson, Pres. <br />City of Lodi <br />Mary Anna Love, Vice Pres. <br />1601 East Hazelton Avenue, P.O. Box 2009 <br />San Joaquin County <br />Patricia E. Vannucci, Secy. <br />San Joaquin County <br />Tommy Joyce <br />Stockton, California 95201 <br />City of Escalon <br />Earl Pimentel <br />City of Manteca <br />Virginia Mathews <br />(209) 466-6781 <br />City of Ripon <br />Daniel L. Flores <br />City of Stockton <br />John D. Mast, M.D. <br />Jogl Khanna, M.D., M.P.H., District Health Officer <br />City of Tracy <br />San Joaquin County <br />March 31, 1988 <br />Desert Petroleum Inc., <br />John Rutherford <br />P 0 Box 1601 <br />Oxnard, CA 93032 <br />RE: Monitoring Alternative #6 and Removal of Waste Oil Tank <br />Implementation of monitoring alternative #6 requires the following <br />information to be submitted to the San Joaquin Local Health District: <br />1. Submit a permit application with the workplan and proposal for <br />all vadose monitoring wells. <br />2. Verify the presence of sand or pea gravel backfill for the vadose <br />monitoring devices. <br />3. Verify the vadose zone by documenting the distance between the <br />bottom of the tank and the ground water. <br />4. Include the soil and ground water sampling on the vadose monitoring <br />well installation proposal. <br />5. If there is any contamination identified on the initial soil sample <br />then a full site assessment must be performed and remediation alternative <br />proposed. (Tani: removal maybe required as part of remediation). <br />Permanent closure requirements shall apply to waste oil tanks where <br />the storage of hazardous substances has ceased and where the owner <br />has no intent within the next two (2) years of using this tank. Enclosed <br />you will find a closure packet. <br />If you have any questions contact Jaime Favila, R.S. of my staff at <br />(209)468-3440 between the hours of 8-9 AM Monday through Friday. <br />Jogi Khanna, M.D., MPH <br />District <br />P111lth Officer <br />/Roti Valino .' R.S. Director <br />Environmental Health Division <br />RV/JF:jw <br />
The URL can be used to link to this page
Your browser does not support the video tag.