Laserfiche WebLink
-2 - <br />maintained as specified herein and in the following exhibits. Exhibit 1 contains a list of the <br />equipment certified for use with the VST Phase II EVR System including Veeder-Root ISD. <br />Exhibit 2 contains the performance standards, specifications, and typical installation drawings <br />applicable to the VST Phase II EVR System Including Veeder-Root ISD as installed in a <br />gasoline dispensing facility (GDF). Exhibit 3 contains the manufacturing performance <br />standards and specifications. Exhibit 4 provides items required in conducting TP -201.3. <br />Exhibit 5 is the liquid removal test procedure. Exhibit 6 is the VST ECS hydrocarbon sensor <br />verification test procedure. Exhibit 7 is the VST and Veeder-Root Phase II EVR System <br />Including Veeder-Root ISD Warranty. Exhibit 8 is the vapor pressure sensor verification test <br />procedure. Exhibit 9 is a test procedure for determining the VST ECS vapor processor <br />activation pressure. Exhibit 10 is the nozzle bag test procedure. Exhibit 11 is the Veeder- <br />Root vapor polisher operability test procedure. Exhibit 12 is the Veeder-Root vapor polisher <br />hydrocarbon emissions verification test procedure. Exhibit 13 is the operability test <br />procedure for the Veeder-Root ISD flow meter. Exhibit 14 provides items required in <br />conducting TP -201.4. <br />IT IS FURTHER ORDERED that compliance with the applicable certification requirements, <br />rules and regulations of the Division of Measurement Standards of the Department of Food <br />and Agriculture, the Office of the State Fire Marshal of the Department of Forestry and Fire <br />Protection, the Division of Occupational Safety and Health of the Department of Industrial <br />Relations, and the Division of Water Quality of the State Water Resources Control Board are <br />made conditions of this certification. <br />IT IS FURTHER ORDERED that VST and Veeder-Root shall provide a warranty for the vapor <br />recovery system and components to the initial purchaser. The warranty shall be passed on <br />to each subsequent purchaser within the warranty period. The manufacturer of components <br />listed in Exhibit 1 not manufactured by VST or Veeder-Root shall provide a warranty to each <br />of their components certified herein. The warranty shall include the ongoing compliance with <br />all applicable performance standards and specifications and shall comply with all warranty <br />requirements in Section 16.5 of the Certification Procedure. VST, Veeder-Root, or other <br />manufacturers may specify that the warranty is contingent upon the use of trained installers. <br />IT IS FURTHER ORDERED that every certified component manufactured by VST and <br />Veeder-Root shall be performance tested by the manufacturer as provided in Exhibit 3. <br />IT IS FURTHER ORDERED that the certified VST Phase II EVR System Including Veeder- <br />Root ISD shall be installed, operated, and maintained in accordance with the ARB Approved <br />Installation, Operation, and Maintenance Manual. A copy of this Executive Order and the <br />ARB Approved Installation, Operation and Maintenance Manual shall be maintained at <br />each GDF where a certified VST Phase II EVR System Including Veeder-Root ISD is <br />installed. <br />IT IS FURTHER ORDERED that equipment listed in Exhibit 1, unless exempted, shall be <br />clearly identified by a permanent identification showing the manufacturer's name, model <br />number, and serial number. Within 60 days after the issuance of this Executive Order, VST <br />and Veeder-Root shall provide a picture to ARB, in the format designated by the Executive <br />Officer or Executive Officer Delegate, showing permanent identification of each component <br />as listed in Exhibit 1. <br />VST Phase 11 EVR System Including Veeder-Root ISD — VR -204-E <br />