Laserfiche WebLink
-3 - <br />IT IS FURTHER ORDERED that any alteration in the equipment parts, design, installation, or <br />operation of the system certified hereby is prohibited and deemed inconsistent with this <br />certification, unless the alteration has been submitted in writing and approved in writing by <br />the Executive Officer or Executive Officer delegate. <br />IT IS FURTHER ORDERED that the following requirements are made a condition of <br />certification. The owner or operator of the VST Phase II EVR System Including Veeder-Root <br />ISD shall conduct and pass the following tests no later than 60 days after startup and at least <br />once in each twelve month period, using the following test procedures: <br />■ TP -201.3, Determination of 2 Inch WC Static Pressure Performance of Vapor <br />Recovery Systems of Dispensing Facilities (March 17, 1999); <br />■ TP -201.4, Dynamic Back Pressure (July 3, 2002) in accordance with the condition <br />listed in item 1 of the Vapor Collection section of Exhibit 2; <br />■ Exhibit 4, Required Items in Conducting TP -201.3; <br />■ Exhibit 5, Liquid Removal Test Procedure; <br />■ Exhibit 6, VST ECS Hydrocarbon Sensor Verification Test Procedure (if a VST <br />ECS membrane processor is installed); <br />■ Exhibit 8, Vapor Pressure Sensor Verification Test Procedure; <br />■ Exhibit 9, Determination of VST ECS Processor Activation Pressure (if a VST ECS <br />membrane processor is installed); <br />■ Exhibit 11, Veeder-Root Vapor Polisher Operability Test Procedure (if a Veeder- <br />Root Vapor Polisher is installed); <br />■ Exhibit 12, Veeder-Root Vapor Polisher Hydrocarbon Emissions Verification Test <br />Procedure (if a Veeder-Root Vapor Polisher is installed); <br />■ Exhibit 13, Operability Test Procedure for the Veeder-Root ISD Flow Meter, and <br />■ Exhibit 14, Required Items in Conducting TP -201.4. <br />Shorter time periods may be specified in accordance with local district requirements. <br />Notification of testing, and submittal of test results, shall be done in accordance with local <br />district requirements and pursuant to policies established by that district. Alternative test <br />procedures, including most recent versions of the test procedures listed above, may be used <br />if determined by the ARB Executive Officer or Executive Officer delegate, in writing, to yield <br />equivalent results. <br />IT IS FURTHER ORDERED that the following requirements are made a condition of <br />certification. The owner or operator of the VST Phase II EVR System Including Veeder-Root <br />ISD shall conduct, and pass, the following tests no later than 60 days after startup using the <br />following test procedure: Exhibit 10, Nozzle Bag Test Procedure. Notification of testing, and <br />submittal of test results, shall be done in accordance with local district requirements and <br />pursuant to the policies established by that district. Alternative test procedures, including <br />most recent versions of the test procedures listed above, may be used if determined by the <br />ARB Executive Officer or Executive Officer delegate, in writing, to yield equivalent results. <br />IT IS FURTHER ORDERED that, except as provided above, local districts at their option will <br />specify the testing, related sequencing, and testing frequency of the nozzle vapor valves, <br />VST ECS Membrane Processor, and Veeder-Root Vapor Polisher. If the district requires the <br />VST Phase 11 EVR System Including Veeder-Root ISD — VR -204-E <br />