My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2300 - Underground Storage Tank Program
>
PR0231401
>
COMPLIANCE INFO_2005-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:48:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2012
RECORD_ID
PR0231401
PE
2361
FACILITY_ID
FA0006388
FACILITY_NAME
KWIK SERVE
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
01
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231401_950 W ELEVENTH_2005-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AML <br />-4- <br />nozzle vapor valve be tested, the test shall be conducted in accordance with Exhibit 10, <br />Nozzle Bag Test Procedure. <br />IT IS FURTHER ORDERED that the VST Phase 11 EVR System Including Veeder-Root ISD <br />shall be compatible with gasoline in common use in California at the time of certification. The <br />VST Phase 11 EVR System Including Veeder-Root ISD is not compatible with gasoline that <br />has a methanol content greater than 5 percent, an ethanol content greater than 10 percent, <br />or a methyl tert butyl ether (MTBE) content greater than 15 percent. Any modifications to <br />comply with future California gasoline requirements shall be approved in writing by the <br />Executive Officer or Executive Officer delegate. <br />IT IS FURTHER ORDERED that the certification of the VST Phase 11 EVR System Including <br />Veeder-Root ISD is valid through April 1, 2012. <br />IT IS FURTHER ORDERED that Executive Order VR -204-D issued on October 17, 2008, is <br />hereby superseded by this Executive Order. VST Phase 11 EVR System Including Veeder- <br />Root ISD certified under Executive Order VR -204-A through D may remain in use at existing <br />installations. This Executive Order shall apply to new installations or major modification of <br />Phase 11 Systems with a throughput of more than 600,000 gallons per year. The installation <br />of the Veeder-Root ISD System is not authorized on a GDF with a throughput of less than or <br />equal to 600,000 gallons per year. <br />Executed at Sacramento, California, this day of December 2008. <br />William V.L_gsCmfoff, Chief <br />Monitoring and Laboratory D ision <br />Attachments: <br />Exhibit 1 Equipment List <br />Exhibit 2 System Specifications <br />Exhibit 3 Performance Standards and Specifications <br />Exhibit 4 Required Items in Conducting TP -201.3 <br />Exhibit 5 Liquid Removal Test Procedure <br />Exhibit 6 VST ECS Hydrocarbon Sensor Verification Test Procedure <br />Exhibit 7 Warranty <br />Exhibit 8 Vapor Pressure Sensor Verification Test Procedure <br />Exhibit 9 Determination of VST ECS Processor Activation Pressure <br />Exhibit 10 Nozzle Bag Test Procedure <br />Exhibit 11 Veeder-Root Vapor Polisher Operability Test Procedure <br />Exhibit 12 Veeder-Root Vapor Polisher Hydrocarbon Emissions Verification Test <br />Procedure <br />Exhibit 13 ISD Vapor Flow Meter Operability Test Procedure <br />Exhibit 14 Required Items for Conducting TP -201.4 <br />VST Phase 11 EVR System Including Veeder-Root ISD — VR -204-E <br />
The URL can be used to link to this page
Your browser does not support the video tag.