Laserfiche WebLink
Page 21 of 23 Standard Operating Procedures <br />Health and Safety Plans <br />13.6 Adverse Weather Conditions <br />In the event of adverse weather conditions, the SHSM will determine if work can continue <br />without sacrificing the health and safety of all field workers. Some of the items to be considered <br />prior to determining if work should continue are: <br />• Heavy rainfall; <br />• Potential for heat stress; <br />• Potential for cold stress and cold -related injuries; <br />• Limited visibility; <br />• Potential for electrical storms <br />• Potential for malfunction of H & S monitoring equipment or gear; and <br />• Potential for accidents. <br />4 <br />ROUX ASSOCIATES HASP. 4/93 3425 Tracy Boulevard <br />Tracy, California <br />