My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_1993-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 4:32:06 PM
Creation date
6/3/2020 9:48:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2002
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_1993-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jun 25-2002 03:17pm From-ARCO PROD +714-670-3095 T-919 P.004/006 F-953 <br /> D. Resuks of Testing/Servicing <br /> Software Version Installed: _ <br /> Complete the following checklist: ' <br /> )a Yes 0 No* Is the audible alarm o erational? <br /> Yes ❑ No* Is the visual alarm operational? <br /> Yes ❑ No,, Were all sensors visually inspected,funcdonaill tested,sncl confirmed operational? <br /> fl Yes No+- Were all sensors-installed at lowest point of secondary Containment and positioned so that other equipment will <br /> not interfere with their proeer o erasion? <br /> ❑ Yes ❑ Non; If alarms arc relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> A N/A operational? <br /> tQ Yes ❑ No* For pressurized piping systems, does the turbine automatit ally shut down if the piping secondary containment <br /> C] NIA monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply)An Sump/Trant h sensors; ❑Dispenser Containment Sensors. <br /> Did You confirm Rosidvc shut-down due to leaks and sensor failure/disconnection?AtYes; 0 No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> IS N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill int($)and oLxruing properly? If so.at njELRprcent of tank ca2aci!X does the alum trigger? % <br /> ❑ Yes* M. No Was any monitoring equipment replaced? if yes,identify:.pecific sensors,probes,or othor equipment replaced <br /> and list the manufacturer name and model for all re lacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containment system:,designed as dry systems? (Check all that apply)❑ <br /> Product; ❑Water. If yes,describe causes in Section E,below, <br /> 4' Yes 19: Noy Was monitorin&s stem sot-ureviewed to ensure proper settings?Attach set up reports,if spElicabic <br /> Xe& ❑: No- is all monitoring equipment o erational er manufacturer's s ccifications? <br /> In Section E below,describe how and when these deficiencies were or will be eorrect:e(L <br /> E. Coxnxnents: hQ = Al� zimQ <br /> Page 2 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.