My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_1993-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 4:32:06 PM
Creation date
6/3/2020 9:48:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2002
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_1993-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jun-P-2002 03:17pm From-ARCO PROD +714-670-3095 T-919 P.0O5/OO6 F-953 <br /> k'. Yn.Tan4 Gauging/SM Equipment: ❑ heck this bo),if tank eauging is used only for inventory control. <br /> �I Check this bo). if no tank gauging or SIR equipment is installed. <br /> ° This section must be completed if in-tank gau;ing equipment is used to perforin leak detection monitorinal. <br /> Gam lets the follo, ng checklist: <br /> ❑ Yes 1 ❑ Nom Has all input wiring bcen inspected for proper envy and term,nation,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank-gauging probes visually inspected for datnaa and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ Now Was accuracy of system water level readings tested? <br /> ❑ Yes ® No* Were.all probes reinstalled properly? <br /> [Were all items on the equipment rrlanufacturer's maintenance checklist completed? <br /> Ir In the Section H,below,describe how and when these deficiencies were or will be corrected, <br /> G. Line lL,e;tk Detectors (LLD).- © Check this box if LLDs are not histalled. <br /> COMPIC the roll& inp checklist: <br /> Yes 0 No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLE) perfomance? <br /> © NIA (Ct:ick all rhar app(y) Simulated leak race: M 3 g.p.h.; A 0.1 g.p.h; ©0.2 g.p.h. <br /> l� Yes 0 No* Were all LLDs confucrned operational and accurate within regalatory requirements? <br /> dpi Yes ❑ No's Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if ii detects a leak? <br /> ❑ N/A <br /> X Yes ❑ No* For electronic LLDs,does the turbine automatically shut off ii the LLD•detecm a leak? <br /> ❑ N/A <br /> Yes M Now For electronic LLDs,does the turbine auto=dcally shut off X any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> IX Yes ❑ No* For electronic LLDs,does the turbine automatically shut off ii any portion of the monitoring system malfunctions <br /> d N/A or fails a test? <br /> Yes ❑ No* For electronic LLDs,have aIi accessible wiring connections buen visually inspected? <br /> 0 N/A <br /> Yes ❑ No, Were all items on the equipment Manufacrurer's maintenance.:heckl4s completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected_ <br /> r <br /> H. Comments: ��1 ' eC ggp iC' <br /> let ,S <br /> Page 3 of 3 ttsroi <br />
The URL can be used to link to this page
Your browser does not support the video tag.