Laserfiche WebLink
SWRCB,January 2002 <br /> Page 1,o <br /> 4. SPILIJOVERFUL CONT NT BOXES l> 'ol1> .3 <br /> Facility is Not Equipped With Svill/Ovarffi Contaimmit Boxes <br /> Spill/Overfill Contabunent Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manuhicturer Standad Professional Engineer <br /> Other(Speco) <br /> Test Method Used: Pressure Vacuum <br /> ydrosta' <br /> gfy) <br /> Test]Equip t Used: Equipment Resolution: <br /> (� Spill c spill Bax Spill : plll Box <br /> Bucket Diameter. <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> s test: <br /> 'fest Start Time: <br /> initial Reading W: <br /> Test End Time: <br /> Final Reading(Rp): -�•. ` • <br /> Test tion. <br /> Change m Read (FrU: <br /> Pas&Tail Threshold or <br /> Criteria. !b t4 6 7 <br /> Test Result: Pass Pass Pass P <br /> Comments—(include!1formation on Leaft made prior to testin ,and rwommended ollow-u or ailed tests <br />