Laserfiche WebLink
SWRCB,January 2002 Pag of-3- <br /> 4. SPILIJOVERFELL CONTAINYENT BOXES Co I .3 <br /> Fa!i is Not Equipped With Spill/Overfill inment Boxes <br /> S&Overfill Contabment Boxes are Present but were Not Tested <br /> Test Method DevelopedBy: Spill.Bucket Manufacturer Professional Engineer <br /> Odker(SPefy) <br /> i Test Method Used: Pressure Vactuanydrostati <br /> Other gpeC6) <br /> Test EVApment Used:Yjjjg Equipment Resolution: <br /> SPMBa= Sgill Box Spill Box#4 Spill Bos# <br /> Bucka Dianwer. d 3` <br /> Bucket Depth: <br /> Watt Ume between applying <br /> pressureJvacuum/water and j l tial 1 a•�3 �wrw <br /> test: <br /> Test Start Time: i CX ICY, t <br /> Wtial Reading N: <br /> Test End Ti ¢ <br /> Final Reading(14): <br /> Test Duratiow. <br /> -Change in Reading(Rrn: <br /> Pass/Fail Threshold or <br /> Criteria: <br /> TestResult: Pass WrP s Pus <br /> Comments -»(Include in ormation on EMat made por to testin , and recommended o71aw-u or ailed tests) <br /> /—/f/ <br />