My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 4:11:28 PM
Creation date
6/3/2020 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />TFCT Nn_ t _ TTNDFR_D1QPF,NSF,R CONTAINMENT fUDCI TESTING Nee 1 of 1 <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum © Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Tester <br />Equipment Resolution: <br />MEMENEE <br />soUDC #1 & 2 <br />UDC #3 & 4 <br />UDC #5 & 6 <br />UDC #7 & 8 <br />UDC Manufacturer: Green Plastic <br />Green Plastic <br />Green Plastic <br />Green Plastic <br />UDC Material: Plastic <br />Plastic <br />Plastic <br />Plastic <br />UDC Depth: XXX <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC sensor detects liquid (both ❑ Yes ❑No ONA <br />product and water)?` <br />❑ Yes ❑No ONA <br />❑ Yes ❑No ONA <br />❑ Yes ❑No ONA <br />Turbine shutdown response time <br />Is system programmed for fail- ❑ Yes ❑ No ONA <br />safe shutdown? <br />❑ Yes ❑ No ©NA <br />❑ Yes ❑ No i]NA <br />❑ Yes ❑ No ONA <br />Was fail-safe verified to be ❑ Yes ❑No ®NA <br />operational?* <br />❑ Yes' ❑No ®NA <br />❑ Yes ❑No ONA <br />❑ Yes ❑No ©NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />Test Start Time: 6:31pin <br />6:31pm <br />7:48pm <br />7:48pm <br />Initial Reading (RO: 2.2800 <br />3.7960 <br />7.4333 <br />6.6557 <br />Test End Time: 6:46pm <br />6:46pm <br />8:03pm <br />8:03pm <br />Final Reading (RF): 2.2803 <br />3.7967 <br />7.4331 <br />6.6572 <br />Test Duration: 15 min. <br />15 min. <br />15 min. <br />15 min. <br />Change in Reading F -RI): +,0003 <br />+.0007 <br />-.0002 <br />+,0015 <br />Pass/Fail Threshold or Criteria: 3rdParty Certified <br />3'd Party Certified <br />3rd Party Certified <br />3rdParty Certified <br />Test Result 1�,.-Pass . _ ®Fail ; <br />©`Pass ,, E1,_ ail <br />Pass ❑Fait <br />Pass 13 Fail <br />Was sensor removed for testing? ❑ Yes ❑No DNA <br />❑ Yes ❑ No [INA <br />❑Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and ❑ Yes ❑No DNA <br />verified functional after testing? <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Big <br />
The URL can be used to link to this page
Your browser does not support the video tag.