Laserfiche WebLink
TEST NO. 1- SPILL/OVERFILL CONTAINMENT BOXES <br />Pae 2 of 2 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum O Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Tester <br />Equipment Resolution: <br />Spill Box #87-3 fill <br />Spill Box #87-3 vap <br />Spill Box #91 fill <br />Spill Box #91 vap <br />Bucket Diameter: <br />5 gal <br />5 gal <br />5 gal <br />5 gal <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: Per Protocol <br />Test Start Time: <br />8:58am <br />10:00am <br />9:17am <br />10:00am <br />Initial Reading (RI): <br />3.2095 <br />3.5664 <br />3.2206 <br />1.8915 <br />Test End Time: <br />9:13am <br />10:15am <br />9:32am <br />10:15am <br />Final Reading (RF): <br />1 3.2100 <br />3.5664 <br />3.2203 <br />0.8340 <br />Test Duration: <br />15 min. <br />15 min. <br />15 min. <br />15 min. <br />Change in Reading (RF- <br />RI <br />+.0005 <br />none <br />-.0003 <br />-1.0575 <br />Pass/Fail Threshold or <br />Criteria: <br />3rd Party Certified <br />3rd Party Certified <br />3rd Party Certified <br />0.002 in. <br />Testi Result <br />®Pass"", ❑Fail <br />® Pass": ❑Fail <br />O' Pass ❑Fail <br />❑Pass ©Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />