Laserfiche WebLink
• <br />SHELL OIL COMPANY <br />FICATIONS - GENERAL CONTRACTOR <br />LOCATION: SHELL SERVICE STATION <br />3725 TRACY BLVD. <br />TRACY, CALIFORNIA <br />SCOPE OF WORK: GENERAL CONTRACTOR TO INSTALL NEW STORAGE TANKS AND AN <br />IN -BAY CAR WASH SYSTEM. <br />DETAILS: <br />1. See steel contractor's Scope of Work under separate contractor. <br />,f 1* <br />2. Permits will be paid for by Shell as net extra to contract. <br />A. Fire Department tank and piping permit <br />B. County APCD permit <br />C. City Building permit <br />D. City sign permit <br />,/�. Health Department Tank & Piping permit <br />3. Permits required of individual trades to be supplied by contractor. <br />0,4. Schedule of work will be organized to require a minimum shut down of <br />gasoline facility. Shell to clean the existing underground -tanks <br />prior to contra nr ramoul. Contractor to gas -free ani deliv <br />„a o ri d in—ILacramenjo for disDosal. Shell will <br />refain ownership of tanks. Contaminated soil is not anticipated. <br />Contractor to figure excess soil and sand removal in normal manner. <br />A dry hole is anticipated. <br />5. Contractor to furnish all electrical work necessary for the complete <br />job, including tanks, car wash, and new 400A 3 phase service. <br />All product pipe and vapor return piping to be new A,_0 S�'th -4 <br />fiber lass from the new fiberglass tanks to the dispensers. I <br />7. Underground tanks to be Owens Corning doub� 1_ a wall with liquid leak <br />detection system to be installed in service station. <br />V8. Install Veeder Root electronic gasoline level system. Shell will, <br />supply electronic equipment.slo�� c <br />9. Contractor to connect sump in ca`h wash bay to sewer at rear of <br />service station. <br />10. Contractor to install strip drain at car wash exist and connect to <br />sump. <br />11. Car wash equipment to be installed by others. <br />SCD6130/8524005/d5 <br />