Laserfiche WebLink
rte__ <br />1 <br />• -2- 0 <br />12. Remove masonry block trash enclosure. <br />13. Remove existing hoist in Car Wash Bay. <br />14. Install air & water piping for car wash. <br />15. Install electrical boxes and conduits in wash bay for car wash <br />connection. <br />16. Install concrete island and two vacuum cleaners furnished by Shell. <br />17. Remove concrete bumper blocks at front and rear of building as noted. <br />18. Regrade area at rear of building as noted. <br />19. Install handicap concrete ramp at building front as shown. <br />20. Remove restroom partitions as shown on drawing and install new <br />handicap partitions only. <br />21. Provide all restroom work as shown on Drawing D -3993-D2. <br />22. Painting and parking lot striping by others. <br />23. Connect 2" Fiberglas product and 3" Fiberglas vapor piping to <br />existing as marked on DWG Z -3993-P-8. Manifold 3 each 2" vapor pipes <br />to 1 each 3" vapor pipe. <br />24. Relocate tank vents and patch roofing. <br />SHELL OIL COMPANY SUPPLIED: <br />1. Painting and parking lot striping <br />2. RYKO Car Wash <br />3. 2 each Vacuum Cleaners <br />04. each 10M Owen -Corning Fiber las Tanks <br />5. Struc ura steel work <br />6. Tank special fittings (see attached list) <br />us7. 3 each Red Jacket Sub Pumps and Leak Detectors <br />8. Veeaer Roo ectronic Tank Gauge <br />SCD6130/8524005/d5 <br />5( <br />i <br />