My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:52:19 PM
Creation date
6/3/2020 9:48:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231417_3725 N TRACY_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />A. <br />Page 2 <br />SECONDARY PIPE TESTING <br />Test Method Developed By: <br />FX-] <br />Tank Manufacturer <br />F-1 Industry Standard F-1 Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />XI Pressure <br />F Vacuum Hydrostatic <br />Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Run # 1 reg <br />Piping Run # 2 plus Piping Run # 3 sup <br />Piping Run # <br />Piping Material: <br />fiberglass <br />fiberglass fiberglass <br />Piping Manufacturer: <br />smith <br />smith smith <br />Piping Diameter: <br />311 <br />311 311 <br />Length of Piping Run: <br />2001 <br />200' 2001 <br />Product Stored: <br />reg <br />plus sup <br />Method and location of <br />reg <br />plus sup <br />piping-run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />5 min <br />5 min 5 min <br />starting test: <br />Test Start Time: <br />7: 04 <br />7: 06 8:21 <br />Initial Reading (RI ): <br />3 psi <br />3 psi 3 p s i <br />Test End Time: <br />8:04 <br />8 : 06 9:21 <br />Final Reading (RF ): <br />3 psi <br />3 psi 3 p s i <br />Test Duration: <br />1 hr <br />1 hr 1 hr <br />Change in Reading (RF - P4 ): <br />0 psi <br />0 psi 0 psi <br />Pass/Fail Threshold or <br />0 psi <br />0 psi 0 p s i <br />Criteria: <br />WN <br />MENEM= <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.