Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />n <br />Page 3. <br />Test Method Developed By: <br />❑ <br />El <br />Sump Manufacturer F-1 Industry Standard X❑ Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />❑ <br />Pressure Vacuum Hydrostatic <br />Other (Specify) <br />Test Equipment Used: vp1t <br />1 Sump # 2 <br />Equipment Resolution: <br />Sump # 3 Sump # 4 <br />7Su7nipDiameter: <br />48" 48" <br />48" <br />48" <br />54" 54" <br />54" <br />54" <br />Sump Material: <br />berglass fiberglass <br />fiberglass <br />fiberglass <br />Height from Tank Top to To7ofFJ,,, <br />Highest Piping Pentration: <br />15" <br />1511 <br />15 " <br />Height from Tank Top to Lowest <br />Electrical Pentration: <br />1011 loll <br />1011 <br />1011 <br />Condition of sump prior to testing: <br />good good <br />good <br />good <br />Portion of Sump Tested: 1 <br />1791 1711 <br />1711 <br />1711 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />X❑Yes ❑No❑N MYes ❑No❑N <br />Yes �NoE]N <br />Yes ❑No�1 <br />Turbine shutdown response time: <br />2-5 secs 2-5 secs <br />2-5 secs <br />2-5 secs <br />Is system programmed for fail-safe <br />shutdown?* <br />X Yes N N X Yes N N <br />❑ ❑ ❑ ❑ oF <br />____'Y <br />X Yes N N <br />[7]No[7]NA <br />� <br />X Yes No <br />❑ ❑ <br />Was fail-safe verified to be <br />operational?* <br />E]Yes �No❑N Yes ❑No❑N <br />Yes ❑No❑N <br />Yes ❑No�T <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 min 5 min <br />5 min <br />5 min <br />Test Start Time: <br />7:14 7:19 <br />8: 2 8 <br />8:35 <br />Initial Reading (Ri ): <br />8.497 2.043 <br />9.930 <br />6.620 <br />Test End Time: <br />7:44 7:49 <br />8:58 <br />9:05 <br />Final Reading (RF ): <br />8.431 2.004 <br />-13.679 <br />6.428 <br />Test Duration: <br />30 min 30 min <br />30 min <br />30 min <br />ChangeinReading(RF-Rl ): <br />.005gph .003gph <br />1.90gph <br />.015gph <br />Pass/Fail Threshold or Criteria: <br />. 05gph . 05gph <br />. 05gph <br />. 05gph <br />Was sensor removed for testing? I L.XjYesLjNo[__jNAjX Yes N NA X Yes N NA x Yes No <br />Was sensor properly replaced and �Yes�Nc❑NA �Yes�N�NA L-1, J �NA Yes �No�l <br />verified functional after testing? <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />starting and ending values are taken off the vp t and are used to ca u ate the GPH <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />