My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:52:19 PM
Creation date
6/3/2020 9:48:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231417_3725 N TRACY_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />! T 7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page 4. <br />Test Method Developed By: <br />F-1 <br />UDC Manufacturer O Industry Standard X❑ Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />F] <br />Pressure F Vacuum ❑x Hydrostatic <br />5 min <br />Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />UDC# 1/2 UDC# 3/4 <br />NNEEmm— <br />UDC# 5/6 UDC# 7/8 <br />UDC Manufacturer: opw opw <br />opw opw <br />UDC Material: <br />fiberglas <br />fiberglass <br />fiberglass <br />fiberglass <br />UDC Depth: <br />3211 <br />3211 <br />3211 <br />3211 <br />Height from UDC Top to Top of <br />1811 <br />181, <br />1811 <br />1811 <br />Highest Piping Pentration: <br />8.590 <br />6.410 <br />Height from UDCTop to Lowest <br />loll <br />10 11 <br />1011 <br />1011 <br />Electrical Pentration: <br />9:55 <br />10:40 <br />Condition of UDC prior to testing: <br />good <br />good <br />good <br />good <br />Portion of UDC Tested: I <br />2011 <br />2 0" <br />2011 <br />2011 <br />Does turbine shut down when <br />15 min <br />15 min <br />sump sensor detects liquid (both <br />A lYes �No�N <br />Yes E]No�N <br />Yes �N�N <br />Yes ❑No❑N <br />product and water)?* <br />. 002gph <br />. 005gph <br />Pass/Fail Threshold or Criteria: <br />Turbine shutdown response time: <br />2-5 secs <br />2-5 secs <br />2-5 secs <br />2-5 secs <br />Is system programmed for fail-safe <br />X ❑ Yes N N <br />❑ � <br />X ❑ Yes N N <br />❑ <br />X ❑ Yes N N <br />❑ � <br />X ❑ Yes [:]NoaA <br />shutdown?* <br />Yes N <br />NA <br />NYes No <br />Was fail-safe verified to be <br />Yes N N <br />❑ � <br />X Yes N N <br />❑ ❑ � <br />Yes N N <br />� ❑ � <br />Yes No <br />� ❑ <br />nneratinnal?* <br />Ye N NA <br />� � <br />X yes N <br />❑ ❑ <br />71 <br />X <br />Wait time between applying <br />pressure/vacuum/water and starting <br />5 min <br />5 min <br />5 min <br />5 min <br />test: <br />Test Start Time: <br />10:22 <br />9:42 <br />9:40 <br />10 :25 <br />Initial Reading (RI ): <br />6.782 <br />8.590 <br />6.410 <br />12.022 <br />Test End Time: <br />10 : 37 <br />9: 57 <br />9:55 <br />10:40 <br />Final Reading (RF ): <br />6.761 <br />8.412 <br />6.388 <br />11.974 <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in Reading (RF- RI ): <br />. 002gph <br />. 021gph <br />. 002gph <br />. 005gph <br />Pass/Fail Threshold or Criteria: <br />. 05gph <br />. 05gph <br />. 05gph <br />. 05gph <br />Was sensor removed for testing? <br />X Yes N NA <br />Yes N NA <br />Yes N <br />NA <br />NYes No <br />R <br />X <br />Was sensor properly replaced and <br />r-,---1 <br />X Ye N NA <br />so � <br />Ye N NA <br />� � <br />Ye N NA <br />� � <br />X yes N <br />❑ ❑ <br />71 <br />X <br />X <br />❑ <br />verified functional after testing? <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />starting ans en Ing va ues are taken off the vp t ain-a are used to calu ate the GPH <br />I If the entire depth of the UDC is not tested, specify how much was tested. If the answer to anv of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.