Laserfiche WebLink
5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specie) <br />Test Method Used: <br />M Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges <br />Equipment Resolution: <br />0.5% of span <br />r. ,,; 4;kua #. <br />Piping Run # te, <br />Piping Run # C, j <br />Piping Run # <br />Piping Material: <br />, rs <br />Piping Manufacturer: <br />Piping Diameter: <br />o` <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings <br />Reducer <br />Boots/Fittings <br />Reducer Boots/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />8,00 - fir► -tea v <br />b' SID A;. --"P-1 <br />: PO M ` - <br />Initial Reading (R,):,�' <br />S i <br />S t <br />S <br />Test End Time: <br />It % <br />1!00 A-,,— <br />J.Po <br />Final Reading (RF): <br />S i <br />S! <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />Test Result: <br />Pass Fail <br />'[ Pass ❑Fail <br />Pass ❑Fail <br />U Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />