My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:52:19 PM
Creation date
6/3/2020 9:48:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231417_3725 N TRACY_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Sump Tester <br />Equipment Resolution: +/- 0.002" <br />STP Sump fjZ <br />S; Su <br />ApSump# <br />STP Sump # Dt t•L <br />Sump Diameter: <br />Sump Depth: <br />r <br />u <br />Sump Material: <br />16, <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height fi-om Tank Top to Lowest <br />Electrical Penetration: &" <br />6 <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑ Yes ❑ No JNA <br />product and water)?` <br />❑ Yes ❑ No 9NA <br />❑ Yes ❑ No [PCNA <br />❑ Yes ❑ No XNA <br />Turbine shutdown response time <br />Is system programmed for fail-safe ❑ Yes ❑ No _L NA <br />shutdown?* <br />❑ Yes ❑ No NA <br />❑ Yes ❑ No b(NA <br />❑ Yes ❑ No 4 NA <br />Was fail-safe verified to be <br />operational?* fail-safe ❑ Yes ❑ No ]�1*!A <br />❑ Yes ❑ No tkNA <br />❑ Yes ❑ No qNA <br />❑ Yes ❑ No C$;NA <br />Wait time between applying <br />pressure/vacuum/water and starting 30 minutes <br />test: <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />Initial Reading(Ri): HI Ir <br />It 533do <br />) - 11110 1K <br />Test End Time: ;'1LrA�- <br />12: h, fir_ <br />VJ-4 )0.V. <br />:tv ✓s.�., <br />Final Reading (Rr): (().S1'il <br />•5"0 <br />/.(rit <br />i � n <br />Test Duration: ( <br />, N <br />Change in Reading(RF-Ri):vow <br />}.vVi30 <br />2 <br />�.vvjloZ <br />Pass/Fail Threshold or Criteria: +/-0.002" <br />+/-0.002" <br />+/- 0.002" <br />+/-0.002" <br />Test Result: Pass ❑ Fail <br />❑ Fail <br />Pass ❑ Fail <br />`Cyl' Pass ❑ Fail <br />Was sensor removed for testing? Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Was sensor properly replaced and Yes ❑ No ❑ NA <br />verified functional after testing? <br />Yes El No El NA <br />Yes 171 No EI NA <br />Yes El No [INA <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.