Laserfiche WebLink
9. FILL RISER CONTAINMENT SUMP TF -WING <br />Facility is Not Equipped With Fill Riser Containment Sumps ❑ <br />Fill Riser Containment Sumps are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Sump Manufacturer N Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum N Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Sump <br />Tester Equipment Resolution: +/- 0.002" <br />Sum"Diameter: <br />Fill Sump # 87 <br />Fill Sump # 89 <br />Fill Sump # 91 Fill Sump # Diesel <br />42" <br />42" <br />42" 42" <br />Sump Depth: <br />58" <br />58" <br />58" 58" <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />N/A <br />N/A <br />N/A NIA <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />18" <br />18" <br />18" 18" <br />Condition of sump prior to <br />testing: <br />Good <br />Good <br />Good Good <br />Portion of Sump Tested <br />2" above i in <br />2" above piping <br />2" above piping 2" above piping <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass Fiberglass <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />30 minutes <br />30 minutes 30 minutes <br />Test Start Time: <br />10:50 am <br />10:50 am <br />10:29 am 10:29 am <br />Initial Readin (Rj): <br />5.0920 <br />4.2195 <br />5.4385 4.2061 <br />Test End Time: <br />11:05 am <br />11:05 am <br />10:44 am 10:44 am <br />Final Reading (RF): <br />5.0923 <br />4.2192 <br />5.4383 4.2055 <br />Test Duration: <br />15 min. <br />15 min. <br />15 min. 15 min. <br />Change in Reading (RF-Rr): <br />0.0003 <br />0.0003 <br />0.0002 0.0006 <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />+/- 0.002" <br />+/-0.00211 +/-0.00211 <br />Test Result: <br />[] Pass ❑ Fail <br />0 Pass ❑ Fail <br />El Pass ❑ Fail 0 Pass ❑ Fail <br />Is there a sensor in the sump? <br />N Yes ❑ No <br />N Yes ❑ No <br />® Yes ❑ No ® Yes ❑ No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No N NA ❑ Yes ❑ No ®NA <br />Was sensor removed for test in ? <br />N Yes ❑ No ❑ NA <br />N Yes ❑ No ❑ NA <br />N Yes ❑ No ❑ NA N Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />NYes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />NYes ❑ No ❑ NA ®Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing and recommended ollow-up for failed tests) <br />Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work <br />