Laserfiche WebLink
5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuumlwater and <br />starting test: <br />Test Start Time: <br />Initial Reading (RD: <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />10 minutes <br />9:00 am <br />5 psi <br />10:00 am <br />5 psi <br />1 hour <br />None <br />No detectable loss <br />0 Pass ❑ Fail <br />10 minutes <br />9:00 am <br />5 psi <br />10:00 am <br />5 psi <br />1 hour <br />None <br />No detectable loss <br />D Pass ❑ Fall <br />10 minutes <br />9:00 am <br />5 psi <br />10:00 am <br />5 psi <br />1 hour <br />None <br />No detectable loss <br />Pass ❑ Fail <br />10 minutes <br />11:00 am <br />5 psi <br />12:00 pm <br />5 psi <br />1 hour <br />None <br />No detectable loss <br />El Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced Test Boot to Diesel Line. <br />❑ Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges <br />Equipment Resolution: 0.5% of span <br />IMMM <br />Piping Run # 87 <br />Piping Run # 89 <br />Piping Run # 91 <br />Piping Run # Diesel <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />Y <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />100' <br />100' <br />100' <br />100' <br />Product Stored: <br />Gasoline <br />Gasoline <br />Gasoline <br />Diesel <br />Method and location of <br />Reducer boots/fittings <br />Reducer boots/fittings <br />Reducer boots/fittings <br />Reducer boots/fittings <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuumlwater and <br />starting test: <br />Test Start Time: <br />Initial Reading (RD: <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />10 minutes <br />9:00 am <br />5 psi <br />10:00 am <br />5 psi <br />1 hour <br />None <br />No detectable loss <br />0 Pass ❑ Fail <br />10 minutes <br />9:00 am <br />5 psi <br />10:00 am <br />5 psi <br />1 hour <br />None <br />No detectable loss <br />D Pass ❑ Fall <br />10 minutes <br />9:00 am <br />5 psi <br />10:00 am <br />5 psi <br />1 hour <br />None <br />No detectable loss <br />Pass ❑ Fail <br />10 minutes <br />11:00 am <br />5 psi <br />12:00 pm <br />5 psi <br />1 hour <br />None <br />No detectable loss <br />El Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced Test Boot to Diesel Line. <br />