My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 12:59:25 PM
Creation date
6/3/2020 9:48:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231417_3725 N TRACY_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />Sump Diameter: <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />roduct and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?* <br />Was fail-safe verified to be <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testin ? <br />STP Sump # 87 <br />STP Sump # 89 <br />STP Sump # 91 <br />STP Sump # Diesel <br />42" <br />42" <br />42" <br />42" <br />60" <br />60" <br />60" <br />60" <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />16" <br />16" <br />16" <br />16" <br />13" 13" <br />Good Good <br />2" above piping 2" above p <br />13" 13" <br />Good Good <br />2" above piping 2" above p <br />❑ Yes ❑ No ®NA I ❑ Yes ❑ No ®NA ( ❑ Yes ❑ No ®NA ( ❑ Yes ❑ No ®NA <br />N/A <br />❑ Yes ❑ No ®NA <br />30 minutes <br />11:35 am <br />4.2237 <br />11:50 am <br />4.2232 <br />15 min. <br />0.0005 <br />+/- 0.002" <br />El Pass ❑ Fail <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No [INA <br />N/A <br />❑ Yes ❑ No ® NA <br />30 minutes <br />11:35 am <br />3.1662 <br />11:50 am <br />3.1657 <br />15 min. <br />0.0005 <br />+/- 0.002" <br />i] Pass ❑ Fail <br />M Yes ❑ No ❑ NA <br />®Yes❑No DNA <br />N/A <br />❑ Yes ❑No ®NA <br />30 minutes <br />1:07 pm <br />2.5514 <br />1:22 pm <br />2.5512 <br />15 min. <br />0.0002 <br />+/-0.002" <br />® Pass ❑ Fail <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />N/A <br />❑ Yes ❑ No ®NA <br />30 minutes <br />1:07 pm <br />3.0316 <br />1:22 pm <br />3.0316 <br />15 min. <br />None <br />+/- 0.002" <br />® Pass ❑ Fail <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />t°Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to ?Lny of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.