Laserfiche WebLink
tpp <br />• ,rr • <br />TEST DATE: 11/24/98 0 WORK ORDER NUMBER2206708 <br />CLIENT:PARADISO MECHANICAL AUSTIN, TEXAS 78757 (512) 451-6334 SITE:QUICK STOP <br />Tank ID: 89 2 <br />Tank manifolded: No <br />Bottom to top fill in inches: <br />126.0 <br />Product: PLUS <br />Vent manifolded: No <br />Bottom to grade in inches: <br />134.0 <br />Capacity in gallons: 10,000 <br />Vapor recovery manifolded: YES <br />Fill pipe length in inches: <br />34.0 <br />Diameter in inches: 92.00 <br />Overfill protection: YES <br />Fill pipe diameter in inches: <br />4.0 <br />Length in inches: 352 <br />Overspill protection: YES <br />Stage I vapor recovery: <br />DUAL <br />Material: DW FISERG <br />Installed: ATG <br />Stage II vapor recovery: <br />BALANCE <br />CP installed on: <br />COMMENTS <br />End (in) <br />Start (in) <br />Dipped Water Level: <br />New/passed Failed/replaced New/passed <br />Failed/replaced <br />L.D. #1 L.D. #1 L.D. #2 <br />L.D. #2 <br />Dipped Product Level: <br />Probe Water Level: <br />Make: <br />vAPoRLEss <br />Ingress Detected: water Bubble Ullage <br />Model: <br />LD2000 <br />Test time: <br />S/N: <br />n/= <br />Open time in sec: <br />4.00 <br />Inclinometer reading: <br />Holding psi: <br />Holdingpsi: <br />11 <br />VacuTect Test Type: <br />NOT <br />Re <br />111 NOT <br />VacuTect Probe Entry Point: TESTED <br />Test leak rate mVm: <br />189.0 TESTED <br />Pressure Set Point: <br />Metering psi: <br />10 <br />Tank water level in inches: <br />Calib. leak in gph: <br />3.00 <br />Water table depth in inches: <br />Results: <br />PASS <br />Determined by (method): <br />Result: <br />COMMENTS <br />COMMENTS <br />Material: <br />DW FIBERG <br />Diameter (in): <br />2.0 <br />Length (ft): <br />45.0 <br />Test psi: <br />50 <br />Bleedback cc: <br />55 <br />Test time (min): <br />30 NOT <br />NOT NOT <br />Start time: <br />14:35 TESTED <br />TESTED TESTED <br />End time: <br />15:05 <br />Final gph: <br />0.006 <br />Result: <br />PASS <br />Pump type: <br />PRESSURE <br />Pump make: <br />FE PETRO <br />COMMENTS <br />Impact Valves Operational: YES <br />Draft 11/30/1998 13:48 MSHAW <br />