Laserfiche WebLink
INDIVIDUAL • • • AND TEST RESULTS <br />Jfr 713nkmak)gy <br />TEST DATE: 11/24/98 WORK ORDER NUMBER2206708 <br />CLIENT:PARADISO MECHANICAL AUSTIN, TEXAS 78757 (512) 451-6334 SITE:QUICK STOP <br />Tank ID: 87 3 <br />Product: REG UNLEAD <br />Capacity in gallons: 10,000 <br />Diameter in inches: 92.00 <br />Length in inches: 352 <br />Material: DW JCTD ST <br />COMMENTS <br />Start (in) <br />Dipped Water Level: <br />Dipped Product Level: <br />Probe Water Level: <br />Ingress Detected: Water <br />Test time: <br />Inclinometer reading: <br />VacuTect Test Type: <br />VacuTect Probe Entry Point: <br />Pressure Set Point: <br />Tank water level in inches: <br />Water table depth in inches: <br />Determined by (method): <br />Result: <br />Material: <br />Diameter (in): <br />Length (ft): <br />Test psi: <br />Bleedback cc: <br />Test time (min): <br />Start time: <br />End time: <br />Final gph: <br />Result: <br />Pump type: <br />Pump make: <br />COMMENTS <br />Tank manifolded: NO <br />Bottom to top fill in inches: <br />127.0 <br />Vent manifolded: No <br />Bottom to grade in inches: <br />135.0 <br />Vapor recovery manifolded: YES <br />Fill pipe length in inches: <br />35.0 <br />Overfill protection: YES <br />Fill pipe diameter in inches: <br />4.0 <br />Overspill protection: YES <br />Stage I vapor recovery: <br />DUAL <br />Installed: ATG <br />Stage II vapor recovery: <br />BALANCE <br />CP installed on: / / <br />End (in) II <br />New/passed Failed/replaced New/passed Failed/replaced <br />L.D. #1 L.D. #1 L.D. #2 L.D. #2 <br />Make: vAPoRLESs <br />Bubble Ullage <br />Model: LD2000 <br />S/N: n/r <br />Open time in sec: 4.00 <br />Holding psi: 11 <br />NOT <br />Resiliancy cc: 140 NOT <br />TESTED <br />Test leak rate ml/m: 189.0 TESTED <br />Metering psi: 10 <br />Calib. leak in gph: 3.00 <br />Results: PASS <br />DW FIBERG <br />2.0 <br />45.0 <br />50 <br />40 <br />30 <br />14:45 <br />w15:15 <br />0.003 <br />PASS <br />PRESSURE <br />FE PETRO <br />COMMENTS <br />NOT • <br />TESTED i <br />Impact Valves Operational: YES <br />NOT <br />TESTED <br />Draft 11/30/1998 13:48 MSHAW <br />