My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
505
>
2300 - Underground Storage Tank Program
>
PR0231442
>
COMPLIANCE INFO_2003-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2022 10:22:04 AM
Creation date
6/3/2020 9:49:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2009
RECORD_ID
PR0231442
PE
2361
FACILITY_ID
FA0006441
FACILITY_NAME
QUIK STOP MARKET #5124*
STREET_NUMBER
505
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
217-260-21
CURRENT_STATUS
01
SITE_LOCATION
505 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231442_505 N MAIN_2003-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br />ENGINEERING, INC. <br />Muniappa Naidu <br />San Joaquin County <br />Environmental Health <br />600 E. Main Street <br />Stockton, CA 95202 <br />Re: Quik Stop #124 <br />505 N. Main Street, Manteca <br />SR0052711 <br />Dear Muniappa: <br />December 12, 2007 <br />As you are aware, we are being required to expand the scope of work related to the recently <br />issued permit for this facility. <br />During the secondary piping test, we discovered a leak in the 91 line. A subsequent Helium <br />Investigation indicated that the leak was in the area shown on the enclosed drawing. <br />We propose to excavate at that location and make the necessary repair to the 91 secondary <br />line. <br />Enclosed you will find the following: <br />• Site drawing showing the area of the 91 secondary repair and the area of the electrical <br />trenches for the ISD conduits. <br />• Photo of the area of the 91 line repair. <br />• Specification sheet for Ameron Dualoy 3000/1- Fiberglass Pipe & Fittings <br />• Employee certification letter for Ameron Pipe. <br />Please let me know if you need any additional items for this project. <br />Thank you for all of your help on this project. <br />Sincerely, <br />WALTON ENGINEERING, INC. <br />ka &-W-A — <br />Michael E. Walton <br />President <br />916-373-1152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.