Laserfiche WebLink
N PROCEDURES&BEST MANAGEMENT P <br /> FOR MON1TORING DOUBLE-WALL UST SYSTEMS <br /> Quik Stop Market#124 <br /> 50 North Main Street <br /> Manteca,California95336 <br /> The line storage and dispensing system at this location consists of two(2) 10,000 gallon and <br /> o (1)8,000 gallon double-wall fiberglass,dry-interstitial,underground storage tanks serving <br /> two(2)double-s' multi-product di Ds). Product Imes are double-wall fiberglass. <br /> A. Each tank and product line is monitored continuously by probes within the tank annular <br /> space and turbine surnp,respectively. Float and chain assemblies in dispenser trip <br /> shear valves in the event that dispensers leak. <br /> B. The Gilbarco EMC 3.1 tank and line monitoring system is manufactured by Veeder- <br /> Root Leak conditions trigger visual and audible alum located on the monitoring <br /> system control panel. Turbine shutdown will occur if either power is lost to the control <br /> panel and if turbine s s)sense leak co <br /> C. The monitor control pawl is located under the counter behind the cashier position. The <br /> monitor is placed in test mode daily to check alarm ftmcticni. Results are recorded on a <br /> "Daily Monitoring System Inspection Log", <br /> D. Monitoring is the responsibility of Satwinder Singh&Navjot Kaur,Franchisees,or theft <br /> designated duty clerk. Maintenance of the monitoring is the responsibility of <br /> Quik Stop Markets,Inc. All repairs will be authorized by Mike Karvelot,Director of <br /> Environmental Affairs. <br /> E. If an alarm occurs, Franchisee 'll immediately contact the Quik Stop Gasoline <br /> Department,which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorizedrelease to secondary containment has occurred,action will <br /> be immediately en to implement the Sim~Response Phm <br /> F. The monitor panel and probes me checked and certified annually in June. Preventive <br /> maintenance and spill bucket testmg is scheduled wmudly in conjunction with monitor <br /> certification. 5E-999 testing istri-annually in A ('07, '10,ad infinitum). <br /> Q. A description of the gasolines responsibilities are included <br /> in the Franchise Agreement. Initial .training in operation of the tank system and <br /> monitoring equipment is con "on the,fob"under the supervision of Quik Stop <br /> personnel and the DesignatedUST Opwator. <br />