Laserfiche WebLink
Depth of water level from UDC bottom (in.) <br />Comments: <br />6 <br />6 <br />UNDER DISPENSER <br />CONTAINMENT DC TE ISTz0. <br />Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: o Pressure o vacuum • Hydrostatic o Other (see below) <br />Measuring Equipment Used: INCON TS -STS (Electronic Sump Test System) <br />Description <br />Disp # 1/2 <br />Disp # 3/4 <br />Initial Probe Reading <br />UDC manufacturer <br />Brave <br />Brave <br />11:31 AM <br />6,1958 <br />11:31 AM <br />5.3471 <br />UDC material <br />Steel <br />Steel <br />Pass/Fail threshold (10.002 inches / 14Hr.) <br />0.0020 <br />UDC depth (inches) <br />9 <br />g <br />PASS <br />Height from UDC bottom to highest <br />piping penetration <br />Bottom <br />Bottom <br />N/A <br />N/A <br />Height from UDC bottom to lowest <br />electrical penetration <br />Bottom <br />Bottom <br />Condition of UDC prior to testing <br />Dry <br />Dry <br />Portion of UDC tested <br />Entire <br />Entire <br />Type of shut -down present <br />Float <br />Float <br />Was sensor removed for testing? <br />N/A <br />N/A <br />Was sensor properly replace <br />Depth of water level from UDC bottom (in.) <br />Comments: <br />6 <br />6 <br />Wait time for water level to stabilize (hr:min) <br />0:05 <br />0:05 <br />Test start time <br />11:16 AM <br />11:16 AM <br />Initial Probe Reading <br />6.1961 <br />5.3474 <br />Test end time <br />Final Probe Reading <br />11:31 AM <br />6,1958 <br />11:31 AM <br />5.3471 <br />Test duration (hr:min) <br />Change in water level (t 0.0000 inches) <br />0:15 <br />-0.0003 <br />0:15 <br />-0.0003 <br />Pass/Fail threshold (10.002 inches / 14Hr.) <br />0.0020 <br />0.0020 <br />TEST RESULT <br />PASS <br />PASS <br />d after testing? <br />N/A <br />N/A <br />Depth of water level from UDC bottom (in.) <br />Comments: <br />6 <br />6 <br />Wait time for water level to stabilize (hr:min) <br />0:05 <br />0:05 <br />Test start time <br />11:16 AM <br />11:16 AM <br />Initial Probe Reading <br />6.1961 <br />5.3474 <br />Test end time <br />Final Probe Reading <br />11:31 AM <br />6,1958 <br />11:31 AM <br />5.3471 <br />Test duration (hr:min) <br />Change in water level (t 0.0000 inches) <br />0:15 <br />-0.0003 <br />0:15 <br />-0.0003 <br />Pass/Fail threshold (10.002 inches / 14Hr.) <br />0.0020 <br />0.0020 <br />TEST RESULT <br />PASS <br />PASS <br />cvio vvmwri anymaenny, mc. <br />