My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_1997-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 12:42:13 PM
Creation date
6/3/2020 9:49:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2006
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231454_1700 E YOSEMITE_1997-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, r <br /> F. In-Tank Guaging/SIR Equipm nt: [x] Check this box if tank guaptis used only for inventory control. <br /> ❑ Check this box if tank guaging or SIR equipment is installed. <br /> This section must be completed if in-tank guaging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> X1 Yes ❑ No* Has all input wiring been inspected for proper enter and termination,including testing for ground faults? <br /> x —Ye s El No* Were all tank guaging probes visually inspected for damage and residue buildup? <br /> �xj Yes No* Was accuracy of system product level readings tested? <br /> x Yes No* Was accuracy of system water level readings tested? <br /> x Yes No* Were all probes reinstalled properly? <br /> x Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> [x] Yes ❑ No* For equip.start-up or annual equipment certification,was a leak simulated to varify LLD performance? <br /> (Check all that apply) Simulated leak rate: [x03 g.p.h.: ❑0.1 g.p.h.; ❑0.2 g.p.h.; <br /> x] Yes No* Were all LLD's confirmed operational and accurate within regulatory requirments? <br /> x Yes No Was the testing apparatus proper y calibrated? <br /> ❑ Yes No For machame LLD's,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> ® Yes No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> [x] N/A <br /> ❑ Yes No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is <br /> M N/A disabled or disconnected? <br /> ❑ Yes No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> [X] NIA malfunction or fails a test? <br /> Yes No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> rxj N/A <br /> x Yes No Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.