Laserfiche WebLink
, r <br /> F. In-Tank Guaging/SIR Equipm nt: [x] Check this box if tank guaptis used only for inventory control. <br /> ❑ Check this box if tank guaging or SIR equipment is installed. <br /> This section must be completed if in-tank guaging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> X1 Yes ❑ No* Has all input wiring been inspected for proper enter and termination,including testing for ground faults? <br /> x —Ye s El No* Were all tank guaging probes visually inspected for damage and residue buildup? <br /> �xj Yes No* Was accuracy of system product level readings tested? <br /> x Yes No* Was accuracy of system water level readings tested? <br /> x Yes No* Were all probes reinstalled properly? <br /> x Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> [x] Yes ❑ No* For equip.start-up or annual equipment certification,was a leak simulated to varify LLD performance? <br /> (Check all that apply) Simulated leak rate: [x03 g.p.h.: ❑0.1 g.p.h.; ❑0.2 g.p.h.; <br /> x] Yes No* Were all LLD's confirmed operational and accurate within regulatory requirments? <br /> x Yes No Was the testing apparatus proper y calibrated? <br /> ❑ Yes No For machame LLD's,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> ® Yes No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> [x] N/A <br /> ❑ Yes No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is <br /> M N/A disabled or disconnected? <br /> ❑ Yes No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> [X] NIA malfunction or fails a test? <br /> Yes No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> rxj N/A <br /> x Yes No Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />