My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_1986-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 4:40:23 PM
Creation date
6/3/2020 9:49:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1995
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_1986-1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of hardcopy accountability of monitor status and EPA <br />Failure to comply with these warnings could <br />required inventory reports. <br />result in serious personal injury, property loss and <br />The Series X76 LVC portion is designed to monitor liq- <br />equipment damage. <br />uid level, vapor density, pressure and hydrostatic <br />3.1 probe Riser Pipe Installation <br />pressure. The system gererates an alarm and may <br />shut down specific facilities if preset parameters are <br />See Installation Drawing for dimensions and in - <br />exceeded. The microprocessor based system <br />stallation requirements. <br />provides visual and audible alarms, self -diasgnostics <br />A. For maximum height to volume conversion ac - <br />and sensor failure indication, fail-safe shutdown and <br />curacy, use one of the threaded bushings <br />auxiliary switch outputs for communications to a <br />closest to the center of the tank and install a <br />facility's remote displays. <br />4" riser pipe (Ansi pipe Sch. 40). The top end <br />The liquid level sensors will indicate presence of <br />of the riser pipe should be threaded to accept <br />liquids in the annular space of double-wall tanks, <br />secondary containment pipes, manhole of caisson <br />a four inch N.P.T., an 950 adapter, and a 950 <br />locking cap with watertight cable grip, which <br />compartments and in -tank high level to prevent over- <br />are supplied with the probe. Insert a 4" <br />fill. <br />diameter riser pipe; install adaptor and cap. <br />The vapor density, measured by the product's unique <br />B. If the tank is buried, excavate the portion con - <br />vapor transducer, is indicated on the appropriate plug- <br />taining the tank hole to be used. Remove the <br />in module in parts per million (ppm) by means of a 4 <br />plug from the hole and insert the riser pipe as <br />1/2 digit LED display. The display not only indicates <br />described above. <br />the initial background vapor density in a vadose well <br />Note: Be sure there is enough clearance be - <br />or the annulus of any secondarily contained vessel, <br />tween the top of the riser and the bottom of the <br />but also monitors an increasing trend of vapor den- <br />manhole cover to allow room for the two -wire <br />sity. The self-contained display also provides the <br />cable supplied with the probe. <br />ability to set the alarm and shutdown setpoints <br />3.2 Manhole Installation <br />without additional calibration equipment. <br />The pressure measurement utilized to monitor pres- <br />Install an #987 square manhole at each probe <br />surized supply piping reads the pressure decay <br />location. Offsetting the probe riser will allow <br />caused by a leak rate greater than 0.05 GPH occur- <br />added ease in junction box installation. <br />ring between automatic test cycles (every 30 minutes). <br />3.3 Conduit Location <br />A hydrostatic measurement is applied to the annulus <br />of a double-wall tank by detecting a loss of pressure <br />WARNING: Probe to controller conduit must <br />in the pressurized cavity or the loss of liquid level in a <br />not exceed 2,500 feet. See Installation <br />Diagram cable notes for proper wiring re- <br />' <br />reservoir or the annulus of the tank. <br />quirements. Runs over 2,500 feet are not U.L. <br />The X76 ETM System, housed in an attractive wall <br />approved for this application. Refer to the <br />mounted NEMA Type 1 Enclosure, contains the intrin- <br />X76 LVC Installation and Operating manual <br />sically safe barrier interface to the transducer, a num- <br />for sensor limitations. <br />ber of three channel alarm modules, vapor modules, <br />WARNING: Explosion may occur if the con - <br />and/or dispenser modules. The front door mounted <br />troller is installed in a volatile, combustible or <br />audible alarm and the flashing alarm lights are ac- <br />explosive atmosphere. <br />knowledged by the ACK button and functionally <br />tested by means of the TEST push button. <br />Failure to comply with these warnings could <br />result in serious personal injury, property loss <br />and equipment damage. <br />(Refer To Installation Drawing) <br />3.0 SITE PREPARATION <br />A. Select a mounting location on the inside wall <br />' <br />of an enclosed building that allows easy ac - <br />WARNING: Take necessary precautions to <br />cess to the controller. When selecting a loca- <br />tion, consider the entry path of the probe wire <br />prohibit vehicles from entering the working area <br />conduit from the underground tanks to the con- <br />during installation or service. <br />troller. The controller should be located with <br />WARNING: During installation and use of this <br />the LCD at eye level. <br />product, comply with the National Electrical Code, <br />federal, state and local codes, and any other ap- <br />B. Run a 3/4" rigid metal conduit between the <br />' <br />plicable safety codes. <br />breaker box and the X76 ETM controller for <br />the power wire input. If a plug connector is <br />
The URL can be used to link to this page
Your browser does not support the video tag.