My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 4:42:40 PM
Creation date
6/3/2020 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Root in ConnectV provides the remote monitoring service. e facility operator responds to <br /> TLS-350 messages, Auto-Dial Failure and Gross Line Leak (also VR Connecticut). Service Station <br /> Systems is the maintenance contractor. Names, Titles and phone numbers, refer to those mentioned in <br /> the Hazardous Materials Management Plans. <br /> If required, Site Plans with locations of tanks, piping, vents, dispensers, monitoring panel, probes <br /> (w/model #'s), buildings and streets should be part of the annual tank & line monitoring system <br /> certification report. <br /> Secondary Containment Testing: Performed upon a new start-up facility and then 6 months after. <br /> Otherwise the testing schedule will be performed starting in 2002 and at 3-year intervals. Testing <br /> procedures are per manufacturer's standards, industry standards or by CA licensed PE procedures. <br /> Hydrostatic testing equipment & procedures are third party certified by CA Petroleum Engineer, Ken <br /> Wilcox Associates, Inc. S13989, LG 160. Hydrostatic tests of the tank wet interstice, dispenser, sumps <br /> and tank overfill containment areas will be for a period of 12 minutes with a passing result, if the <br /> decrease in liquid level is less than 0.002 inches with a probability of 95% or greater, which meets the <br /> requirement to detect a change of 0.250 inches in the 24 hour test period. Double walled tank systems <br /> with dry annular spaces will be vacuum tested per manufacturer's specifications. Secondary piping will <br /> be pressure tested at approximately 5 PSI for 60 minutes or per manufacturer's specifications, hard pipe <br /> verses flex pipe. Test results are to be submitted to the local implementing agency and a copy is sent to <br /> the facility to be kept on site. The local agency will be notified at a minimum of 48 hours of a scheduled <br /> test date. <br /> UNAUTHORIZED RELEASE RESPONSE PLAN <br /> Non-contained unauthorized releases will be reported to the local agency and Shell's HS&E <br /> Compliance Coordinator within 24 hours. Spills to ground will be cleaned up immediately with further <br /> mitigation as determined by the Local Agency and Shell's Science and Engineering Department. The <br /> hazardous material shall be removed by applying absorbent material (maintained at the facility) and/or <br /> Shell's approved contractor would collect the Fuel material and dispose of in accordance with all Local, <br /> State and Federal laws and regulations. Dependant on circumstance, direct removal, drumming or laid <br /> upon non-absorbent material. Shell's approved contractors are responsible for maintaining their <br /> environmental equipment and materials per Local, State and Federal regulations. <br /> See the facility's Safety, Health and Environmental "Blue Book" for more detail; Hazardous Materials <br /> Management Plan(tab HMMP); emergency response plan; procedures and Shell Leak Response Plan. <br /> Emergency response is 4 hours maximum. The service contractor will notify the appropriate Equilon <br /> Personnel in the event of an actual tank/line failure. Alarms, which are or are not the result of an actual <br /> tank or line failure, will be repaired in accordance with the manufacturer's recommendation and all <br /> Local and State requirements. <br /> Preventive maintenance schedule: <br /> When the system alarms Veeder Root calls the facility to verify any problems and notifies their <br /> Authorized Service Organization to respond and make necessary repairs as needed. The system is <br /> tested, repaired as needed and certified operational annually with submittal of the results to the <br /> appropriate Local Agency and Facility. <br /> Miscellaneous <br /> The Facility Operator is responsible for maintaining daily and monthly inventory reconciliation <br /> records. 12 (twelve) months on site and the previous 3 (three) years, optional on site. The Facility <br /> Operator is responsible for reporting inventory reconciliation exceeding State and Shell's allowable <br /> limits and unauthorized spills to ground to Shell's regional Health, Safety and Environmental <br /> Coordinator for review and corrective actions as needed. The facility operator is responsible to adhere <br /> to all conditions of the facility permits and licenses, document accessibility, annual employee <br /> hazardous materials, leak response and other OSHA training and documentation, tank and piping VR <br /> Monthly Compliance Reports and Annual System Certifications, nozzle repair/replacement logs and <br /> facility contractor repair logs and frequently inspect and clean the tank fill and vapor overspill buckets <br /> and dispenser containment pans (maintain free of liquid and debris). <br /> I hereby certify that this monitoring plan described in this document will be followed in//its entirety. ` <br /> Signature: Date ` g�ex <br /> Please contact hell's H, S&E Analyst,Bruce T. Marubashi at 925-766-3 8, if there are any questions regarding <br /> the material contained in this package. <br /> marubashi 7/8/02 Irp <br />
The URL can be used to link to this page
Your browser does not support the video tag.