My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 4:42:40 PM
Creation date
6/3/2020 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEAK RESPONSE PLAN <br /> Aft[TRODUCTION <br /> qw <br /> IT IS THE PURPOSE OF THIS SECTION TO ESTABLISH BASIC GUIDELINES AND PROCEDURES FOR USE BY THE EQUILON <br /> ENTERPRISES, LLC. FOR THE HANDLING OF PRODUCT SPILLS/LEAKS WHICH MAY OCCUR AT EQUILON FACILITIES. <br /> DESIGN AND INSTALLATION IMPROVEMENTS ARE CONTINUOUSLY BEING EVALUATED AND IMPLEMENTED IN ORDER <br /> TO REDUCE, AND ELIMINATE, THE POTENTIAL FOR PRODUCT LEAKAGE. <br /> RESPONSIBLE EQUILON PERSONNEL <br /> NAME TITLE PHONE <br /> Dave Posey Dealer Day: 209-529-2521 <br /> 24hr: 209-524-6240 <br /> Aura Mattis SH&E Coordinator Office: 510-335-5026 <br /> Pager: 800-656-9726 <br /> Alex Perez Environmental Engineer Office: 510-335-5027 <br /> Pager: 800-462-7512 <br /> Brett Hovland Project Engineer Office: 510-335-5032 <br /> Pager: 510-840-2426 <br /> RESPONSIBLE CONTRACTOR <br /> Services <br /> 6 N. Hazel #108 <br /> Fresno CA 93722 <br /> 800-552-7503 <br /> LEAK VE CATION <br /> WHEN A SERVICE STATION PRODUCT LOSS IS SUSPECTED OR REPORTED, THE FOLLOWING LEAK VERIFICATION <br /> PROCEDURES WILL APPLY: <br /> 1. THE EQUILON ENGINEER WILL ARRANGE FOR THE EQUILON TERRITORY MANAGER TO IMMEDIATELY <br /> (THE SAME DAY)VISIT THE STATION TO REVIEW THE DEALER'S PHYSICAL CONTROL OF PRODUCTS AND <br /> INVENTORY RECORDS. <br /> 2. AT THE SAME TIME, THE ENGINEER WILL ORDER A PUMP/DISPENSER CALIBRATION, ASSURE METERS <br /> ARE SEALED, INSPECT ACCESSIBLE POTENTIAL LEAK SOURCES, AND CHECK LEAK DETECTOR <br /> OPERATION(ON REMOTE SYSTEMS). <br /> 3. ALSO, THE ENGINEER SHALL START MAINTAINING A PRODUCT LOSS LOG AS WELL AS A RECORD OF <br /> SIGNIFICANT DAILY LEAK RELATED ACTIVITIES. <br /> 4. IF THE ABOVE INVESTIGATIONS PROVE INCONCLUSIVE, THE TERRITORY MANAGER SHOULD <br /> IMMEDIATELY BEGIN A DAILY INVENTORY LOG (EXHIBIT B), WHICH WOULD BE MAINTAINED FOR A <br /> MINIMUM PERIOD OF 48 HOURS AND A MAXIMUM OF 7 DAYS, FOR SUBSTANTIATION OF A SUSPECTED <br /> LEAK. DEPENDING ON THE CIRCUMSTANCES (POTENTIAL HAZARDOUS CONDITION, ETC.), IT MAY BE <br /> NECESSARY TO TAKE ADDITIONAL LEAK RESPONSE ACTION DURING THE PERIOD OF INVENTORY. <br /> 5. IF PRODUCT LOSSES ARE VERIFIED, PRODUCT LINES AND/OR TANKS MAY REQUIRE TESTING TO <br /> DETERMINE THE LEAK SOURCE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.