My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 4:42:40 PM
Creation date
6/3/2020 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. PRODUCT LINES MAY BE TESTED USING AIR PRESSURE (APPROXIMATELY 50 PSI) OR A Equilon <br /> APPROVED LINE TESTING SYSTEM (E.G., KENT-MOORE). SHOULD THE LINE TESTS INDICATE <br /> LEAKING LINES, THEY SHALL BE REPAIRED OR REPLACED AND RETESTED TO ASSURE THE LEAK <br /> HAS BEEN STOPPED. IN ADDITION,A PRODUCT LOG INVENTORY CHECK SHOULD BE MAINTAINED <br /> FOR A PERIOD OF 7 DAYS AFTER THE LINE REPAIRS TO ASSURE THERE ARE NO OTHER LEAKS IN <br /> THE SYSTEM. <br /> B. SHOULD THE TEST INDICATE THE LINES ARE NOT LEAKING OR IF A SHORTAGE CONTINUES AFTER <br /> THE LINES HAVE BEEN REPAIRED, THE UNDERGROUND TANK(S) SHALL BE TESTED BY A <br /> PRECISION OR OTHER APPROVED PROCEDURE. (SEE N.F.P.A.329). <br /> NOTE: LOCAL FIRE CODES AND ORDINANCES MAY DICTATE THE APPROPRIATE TESTING PROCEDURES FOR USE <br /> ON UNDERGROUND TANKS. AIR TESTS OF UNDERGROUND TANKS ARE NOT RECOGNIZED AS <br /> CONCLUSIVE,ARE DEEMED UNSAFE BY MANY FIRE PREVENTION AGENCIES,AND SHOULD NOT BE USED. <br /> IF THE TANK TEST INDICATES ONE OR MORE TANK LEAKS, REPAIR OR REPLACEMENT WILL BE <br /> COMPLETED. <br /> CORRECTIVE ACTION <br /> 1. THE EQUILON ENGINEERING STAFF SHALL TAKE IMMEDIATE ACTION TO STOP, CONTAIN, AND SHALL <br /> TAKE IMMEDIATE DECISIVE ACTION TO RELIEVE THE THREAT OF PUBLIC HEALTH AND SAFETY <br /> HAZARDS, OR PROPERTY DAMAGE. <br /> 2. IT MAY BE APPROPRIATE TO OBTAIN SAMPLES OF THE RELEASED PRODUCT FOR TESTING AND <br /> IDENTIFICATION BY EQUILON LABORATORY. <br /> 3. OBSERVATION WELLS WILL ONLY BE INSTALLED WITH HEAD OFFICE, MARKETING ENGINEERING, <br /> ENVIRONMENTAL GUIDANCE. IF LOCAL AUTHORITIES AND/OR CONDITIONS DEMAND IMMEDIATE <br /> AWL INSTALLATION, THEN INSTALL THE TEST WELLS IN ACCORDANCE WITH STANDARDS SHOWN FOR <br /> MINIMUM FOUR INCH PVC PIPE WITH INSTALLATION. <br /> IF FORCED, BY SITUATION, TO INSTALL OBSERVATION WELLS OFF SITE ON PUBLIC PROPERTY, <br /> ACQUIRE LOCAL AUTHORITY APPROVAL OR WRITTEN ORDER TO PERFORM THE WORK. <br /> 4. OBSERVATION WELL INSTALLATION STANDARDS (SEE OBSERVATION WELL DETAIL ATTACHED). <br /> A. INSTALL OBSERVATION WELLS IN LOCATIONS SPECIFIED AND/OR APPROVED BY HEAD OFFICE, <br /> MARKETING ENGINEERING, ENVIRONMENTAL. <br /> B. DRILL (AUGER) A MINIMUM 12-INCH DIAMETER HOLE TO A DEPTH OF AT LEAST 5 FEET BELOW <br /> THE MINIMUM WATER TABLE. <br /> C. INTO THE HOLE, INSTALL 4-INCH OR 6-INCH DIAMETER SCHEDULE 40 SLOTTED AND BLANK PVC <br /> PIPE, WITH PIPE SIZE DEPENDENT UPON THE SITE'S GEOLOGY AND LOCAL REGULATIONS. <br /> SLOTTED PIPE SHALL HAVE FACTORY CUT TWENTY THOUSANDTHS (.020)INCH SLOTS. <br /> D. USE SLOTTED PIPE FROM THE BOTTOM OF THE WELL HOLE TO APPROXIMATELY 3 FEET ABOVE <br /> THE MAXIMUM GROUNDWATER TABLE, CONSIDERING WATER TABLE FLUCTUATION. THE <br /> SLOTTED PIPE SHALL BE CAPPED AT THE BOTTOM. <br /> E. THE BLANK PIPE SECTION ATTACHED TO THE TOP OF THE SLOTTED PIPE AND EXTENDS UPWARD <br /> TO JUST BELOW GRADE ELEVATION. AVOID USING GLUE TO COUPLE THE PIPE SECTIONS; <br /> RATHER, USE THREADED PVC PIPE OR OTHER COUPLING METHODS WHENEVER POSSIBLE. A <br /> LOCKABLE CAP SHALL BE INSTALLED ON TOP OF THE BLANK PIPE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.