Laserfiche WebLink
San Joaquin County qW <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone.(209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> RIPON SHELL 341 E MAIN ST, RIPON January 25, 2016 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 204 CCR 2712(1) Current monitoring plan approved by the EHD not found on site. <br /> An approved copy of the monitoring plans were not available for inspection. A copy of these plans shall be <br /> accessible on site at all times. Immediately locate and retain a copy on site. <br /> This is a minor violation. <br /> 314 CCR 2631(a) Primary containment not tight(pre-Jul 2003). <br /> The piping under dispenser 3/4 was observed to be leaking and a small amount of fuel was observed accumulated <br /> in the UDC, indicating a leak in the primary piping. All primary containment for the UST system must be tight. <br /> Immediately have a properly licensed, trained, and certified contractor repair or replace the failed component under <br /> permit and inspection of the EHD. <br /> This is a minor violation. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by February 24, 2016. <br /> Please be aware that as of January 1, 2014, facility operators are required to upload the following UST program <br /> documents into the California Environmental Reporting System (CERS): UST Monitoring Site Plan, UST <br /> Certification of Financial Responsibility, UST Response Plan, UST Letter from Chief Financial Officer (if <br /> applicable), and the Owner Statement of Designated Operator Compliance. The UST Owner/Operator: Written <br /> Agreement, if applicable, can be stored at the facility or uploaded into CERS. <br /> Documents reviewed: Designated Operator (D.O.) monthly inspection reports, alarm history, work <br /> orders/maintenance records, CERS submittals, operating permit, D.O. training records <br /> Documents provided: Return to Compliance Certification form, Schedule of free CUPA classes <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received By Received By(printed name and title): Date: <br /> (signature): Balaji Angle, Owner Is-�1 JD <br /> Inspector Inspector(printed name and title): Inspector Phon . <br /> (signature: STACY RIVERA, Senior REHS (209)468-3440 <br /> Page 5 of 5 <br />