Laserfiche WebLink
2. <br />2. Maintenance shall be conducted in accordance with the Scheduled Maintenance section <br />of the ARB approved Installation, Operation, and Maintenance Manual. <br />Vapor Recovery Equipment Defects <br />The following is deemed a defect for the affected fueling point(s) or system. <br />Fueling Points <br />1. The fueling point shall be removed from service when more than 30% of a nozzle face <br />seal is missing (e.g., a triangular or similar shape in which greater than 2.5 inches of the <br />faceplate circumference is missing (accumulated). <br />2. The fueling point shall be removed from service when more than 0.375 square inches of <br />a nozzle vapor collection sleeve is missing (e.g., a rectangular shape of greater than <br />nine/sixteenth (9/16) inches or more on each side, a circular shape of eleven/sixteenth <br />(11/16) inches or more in diameter, or a triangular shape of seven/eighth (7/8) inches on <br />the side. <br />3. The fueling point shall be removed from service when the total slit length in the <br />convolutions exceeds 18 inches as determined by direct measurements. <br />4. The fueling point shall be removed from service when a hose is found to have greater <br />than 175 ml of gasoline in the vapor side as determined by sections 6.1 to 6.5 of Exhibit <br />5. Note: Prior to draining gasoline from the vapor side of the VST hose, use VST tool <br />P/N VST -STP -100 and plug the fuel spout. Do not activate dispenser when draining <br />gasoline from the vapor side of the VST hose. <br />5. The fueling point shall be removed from service when VST system pressure drops <br />exceeding the following conditions as determined by Methodology 1 of TP -201.4: <br />5.00 inches WC at a flow rate of 60 CFH of Nitrogen; and <br />8.00 inches WC at a flow rate of 80 CFH of Nitrogen. <br />6. The fueling point shall be removed from service when the dispensing rate is greater than <br />ten (10) gallons per minute (gpm) or less than five (5) gpm as determined by the <br />applicable provisions of section 6 or 7 of Exhibit 5 or by direct observation for 30 <br />seconds minimum at the maximum hand held position. <br />7. The fueling point shall be removed from service when any hose has a visible opening as <br />determined by direct observation. <br />8. The fueling point shall be removed from service when the insertion interlock mechanism <br />allows dispensing when the bellow is uncompressed as determined by direct observation <br />or GDF -09 (see Vapor Recovery Defects List). <br />9. The fueling point shall be removed from service when the nozzle automatic liquid shut- <br />off mechanisms malfunction in any manner as determined by EPO No. 26-F (See Vapor <br />Recovery Defects List) or direct observation. <br />VST Phase 11 EVR System Including Veeder-Root ISD, Exhibit 2 - VR -204-H <br />