Laserfiche WebLink
AICDEK August 2003 Page of--- <br /> 6. S TESTING <br /> Test Method Developed By: 0 Sump ❑ Standard x Professional Engineer <br /> 0 Other(Spe " <br /> Test Method Used: ❑Pressm 0 Vacuum xHydrostatic <br /> 1013 Other(Sp <br /> Test Equipment Used:In-Con TS-STS Equipment ResohWon:+-.002" <br /> Samg# t SUMP# Samtp# <br /> Sump Diameter. <br /> Sump Depth: '• <br /> Sump Material: <br /> Height froTank Top to Top of `t u <br /> 1ES!!S9 Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: L a <br /> Condition of sump prior to testing: <br /> Depth of Sump Tested. .� <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes ❑No NA Xes ❑No 0 NA es ❑No DNA 0 Yes ❑No 0 NA <br /> product and water)?- <br /> Turbine <br /> ater)?`Turbine shutdown response time <br /> Is system programmed for fad-safe Yes 0 No NA es 0 No 0 NA OkYes 0 No DNA 0 Yes ❑No 0 NA <br /> shutdown?' <br /> Was fail-safe verified to be 0 Yes ALNo NA 0 Yes 0 NA ❑Yes JNo ❑NA 0 Yes 0 No ❑NA <br /> o 'oral?' <br /> Wait time between applying <br /> pressure/vacuum/waterpressure/vacuum/water and starting <br /> test: <br /> ® Test Start Time: <br /> Initial Reading W: <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: U5 AAaA <br /> Change in Reading(RF-Rt): — 0 <br /> Pass/Fail Threshold or Criteria: �— Z <br /> Test Result 0 I .- 4 0 Fafi ❑ Pass ❑Fail ❑ Pass 0 Fail <br /> Was sensor removed for testing? A'Yes 0 No A $Yes 0 No ❑NA ❑Yes ❑No ❑NA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and <br /> LI! <br /> testing? Yes 0 No A 6 Yes 0 No 0 NA ❑Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Coatments—(include information on <br /> repain made ' ' to testing and recommended ollow-up or ailed tests <br />