Laserfiche WebLink
ACDEK August 2003 Page—_-o, <br /> 7. .R-D N CONT NT MDQ TESTING <br /> Test Method Developed By. D UDC Man D Industry Stmxbxd x Professional Engineer <br /> D Other(SPe <br /> Test Methyl Used: D Pressure D Vacuum x Hydrostatic <br /> D Other <br /> Test Equipment Used.In-Con TS-STSEquipment Resolution:+-.002" <br /> UDC# t-Z._; UDC# .ta UDC# UDC#'7 409 <br /> UDC Manufacturer. <br /> UDC Material: t <br /> Y <br /> UDC Total Depth "' i a _ <br /> Height from UDC Bottom to Top 0 vl � W i <br /> of est Penettation: _ <br /> Height from UDC Bottom to y4 `! k yt <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to 0 <br /> Depth of UDC TestedShUlAl <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both D Yes j. No A ❑Yes A No DNA ❑Yes !Q No ❑NA ❑Yes No ❑NA <br /> and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?` ❑Yes ❑No A D Yes D No QNA ❑Yes D No 19 NA D Yes D No iCNA <br /> Operational?*as Eare verified to be ❑Yes ❑No A ❑Yes ❑No p NA ❑Yes ❑No RNA ❑Yes ❑No 3NA <br /> Wait time between applymg <br /> pressure/ and <br /> swing test F <br /> Test Start Time: <br /> iInitial R (Rr}. <br /> Test End Time: 1 <br /> Final Reading(RF): .7 <br /> Test Duration: <br /> Change in R (RF-Ri): — {(� •® .C3cS L 1 — M. <br /> Pass/Fail Threshold or Criteria: <br /> Test Rsultc B5 Pam t7'Fail Od:Pass ❑Fail ❑Fail <br /> Was sensor removed for testing? li Yes D No D A .Lrl Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA <br /> Was sensor properly replacedmW <br /> V afb ? Q Yes D No C3 A G1.Yes ❑No ❑NA J7 Yes ❑No ❑NA 'D Yes ❑No ❑NA <br /> -Comments—(include hifmmation on r made to tayting and recommended ollow up or failed tests <br />