Laserfiche WebLink
Aug. 4. 2008 12:48 PM West Star Environmental, Inc. No. 0125 P. 5 <br /> v sr A%%,v,idnu:u y LVVG Page 7 of <br /> OSPILL/OVERFELL CONT ENT XES <br /> Facility is Not Equipped With SpilUOverfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) CSWRB <br /> Test Method Used: Pressure Vacuum Hydrostat�e <br /> Other(Specify) X <br /> Test Equipment Used: RAPID CONTROLS BOX,MTS PROSE F.qu�pment Reso ut�on: _002 <br /> Spill Bos#97 Spill Boz#91 Spill Boz# Spill Bog# <br /> Bucket Diameter, 12" 12" <br /> Bucket Depth: 101V 10" <br /> Wait time between applying <br /> pressure/vacuarn/water and <br /> starting test: 15 MIN. 15 MIN. <br /> Test Start Time: 09:15 AM 09;15 AM <br /> initial Reading(Rr): 7" 7" <br /> Test End Time: 09:30 AM 09:30 AM <br /> Final Reading(RF): 7+9 711 <br /> Test Duration: 15 MIN, 15 MIN. <br /> Change in Reading(.RF-Rl): 0" Oft <br /> Pass/Fall Threshold or <br /> Criteria: 002 .002 .002 .002 <br /> Test Result: Pass Fail Pass Fal! — <br /> pass Fail I Pass Fair <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />