My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1097
>
2300 - Underground Storage Tank Program
>
PR0231497
>
COMPLIANCE INFO_1999-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 2:11:22 PM
Creation date
6/3/2020 9:50:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2009
RECORD_ID
PR0231497
PE
2361
FACILITY_ID
FA0000279
FACILITY_NAME
ESCALON MINI MART
STREET_NUMBER
1097
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510001
CURRENT_STATUS
01
SITE_LOCATION
1097 YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231497_1097 YOSEMITE_1999-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aug, 4. 2008(12;48PM)- SlWest Star Environmental, Inc, ekthis box ittank gauginNo, 0125onlyP, 41ventorycontrol. <br /> - ❑ Check this box' tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> 0 Yes ❑No* Has a input wiring been inspected for proper entry and termination,plc u ing testing or group au ts? <br /> CI Yes Nor Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ es No* Was accuracy of system product level readings tested? <br /> ❑Yes TI No* Was accuracy of system water level readings tested. <br /> ❑ Yes No* Were all probes reinstalledtoerl ? <br /> Eilyes I U No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> G. Line Leak Detectors (LLD): ❑Check this lox if LLDs are not installed. <br /> Com fete the follo ing checklist: <br /> Yes ®NO* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply)Simulated leak rate:(g 3 g.p.h.; [10.1 g.p.li_ [10.2 g.pb. <br /> Yes ❑ NO Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes No* Was the testinga aratus properly calibrated? <br /> Yes ° For mechanical T.LDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑Yes NSA For electronic LLDs,does the turbine automatically shat off if the LH)detects a leak? <br /> p Yes <br /> Nos For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconn 7 <br /> Yes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑Yes N°* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> W Yes ❑ No* Were all items on a equipment manufacturer s maintenance check ist comp etc 7 <br /> *to the Section D,below,describe Trow and when these deficiencies were or will be corrected. <br /> H. Comments:INLEADED MLD failed,to be replaced and repairs done on 07/09/08 and verified by inspector. 07/09/08 MLD on <br /> UNLEADED was replaced,tested and passed. Test later verified by inspector. <br /> Page 3 of 4 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.