My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1097
>
2300 - Underground Storage Tank Program
>
PR0231497
>
COMPLIANCE INFO_1999-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 2:11:22 PM
Creation date
6/3/2020 9:50:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2009
RECORD_ID
PR0231497
PE
2361
FACILITY_ID
FA0000279
FACILITY_NAME
ESCALON MINI MART
STREET_NUMBER
1097
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510001
CURRENT_STATUS
01
SITE_LOCATION
1097 YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231497_1097 YOSEMITE_1999-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Jan. 23. 2006 1 .21PMW Star Environmental, Inc. No. 6876 P 4 <br /> r. lea-.Lur n vuugtng l S.2utyiuGuc. UN L1+eck this box gauging as usou only iui niventory contra�l <br /> 13 Check this box= ^o ga=«ging or SM equipment is insta!le <br /> This section trust be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the NO ina checklist: <br /> ff <br /> ❑ o Has ail input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ere tan gauging Pro visua ly anspect or mage andres, ue buy up❑ o as accuracy of system product eve rea ings teste . w <br /> * Yes ❑ o f Was accuracy nf system water level res mgs testeV. <br /> U ❑ o Were all probes reinstalled properly? <br /> ❑ ® Were all items on the equipment manufacturers Fa checklist comp ete ? <br /> e Section h4 below,describe ow an wen Ifiese denciencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> complete the fOU0 ing checklist: <br /> ® Yes p o For equipment start-up or annual equipment certification,was a leak simulated to ver,y LLD j0iiancf�? <br /> . <br /> ❑ NIA (Check all that apply)Simulated leak rate; 0 3 g.p h.; ❑0. 1 g.p.h. ❑0.2 g.p.h. <br /> 10 Yes ❑ o Were-all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ® o as a testing apparatus properly c t rat <br /> l4 Yes Cl NU For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ o For electronic LLDs,does the turbine automatically shut off if the LID detects a GO <br /> ® N/A <br /> Yes For a eetron'c s, oes t e to me automatically shut off if any portion of the m6ftorEg system,s ass <br /> IM NIA or disconnected? <br /> ❑ Yes o For electronic LLDs, oes e m ,ne automatically shut off if any portion of the monitoring system mal 'oi <br /> /A or fails a test? <br /> ❑ Yes 0 For electronic LL s, veessi a wiring connections been visually inspected? <br /> 10 NIA <br /> IN Yes 10 o Were all items on the equipment man cturer s maintenance ch-RUR comp etc . <br /> In the Section 11,below, escre a 5ow goia when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 4 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.