Laserfiche WebLink
SWRCB,January 2002 Page 3 of '7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer W'Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: XPressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec6) <br /> Test Equipment Used: - 15 Equipment Resolution: <br /> Piping Run# $"i Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> I Piping Manufacturer: to t_ a <br /> Piping Diameter: <br /> Length of Piping Run: 17- ► /C7 3 ' <br /> Product Stored: -.5se, t ' <br /> Method and location of —i e$l, P °"f -t'e S`( b -� <br /> i in -run isolation: 4,o 4eS'� i> c f - -ie <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Tim 0 <br /> Initial Reading(RI): S, f" $ <br /> Test End Time: <br /> i <br /> Final Reading(RF): $'L_ 7 ps I- <br /> 1 Test Duration: r <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria dle? T4.55 o'lf c_._S <br /> - � <br /> Test Reset _ Pass R�`_ Fael , Pass ❑Faal Q 1'as ❑Pail p Pass, ❑Fail <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> i <br /> I <br /> i <br /> 1 <br /> i <br /> I <br /> f <br /> i <br /> 1 <br />