Laserfiche WebLink
SWRCB,January 2002 Page—Lf-of 7 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer Industry Standard+. ❑Professional Engineer <br /> ❑Other(Spec6) <br /> Test Method Used: ❑Pressure ❑Vacuum q Hydrostatic <br /> ❑Other(Spec) % <br /> Test Equipment Used: V\c. 4, 1 Equipment Resolution: <br /> maim <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: - d <br /> Sump Depth: <br /> Sump Material: {CLSS r I a� ics <br /> i Height from Tank Top to Top of 1 p r <br /> Highest Piping Penetration: c 1 `7 • S <br /> I Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: C YCr ` <br /> Portion of Sump Tested' A, P. <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No P(NA ❑Yes ❑No ,SNA 0 yes ;.0 No O NA.. ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑:yes ❑No ,X NA ❑Yes ❑No AWA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑Yes ❑No 0KNA ❑Yes ❑No "A ❑Yes ❑No DNA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying ' <br /> pressure/vacuum/water and starting 1. M ` A <br /> test: <br /> Test Start Time: / w%- z <br /> Initial Reading(RI): -i <br /> Test End Time: F <br /> Final Reading(RF): $ _l <br /> Test Duration: �_ S✓►► : ve <br /> n <br /> Change in Reading(RF-RI): non <br /> -7 boo <br /> a Pass/Fail Threshold or Criteria: _ Vl 2-- <br /> 77x <br /> Test ReultPass ❑Faa1� ass ❑ ai ❑ Pass ❑Fall ❑ Pass ❑Fall I <br /> Was sensor removed for testing? , Yes ❑No ❑NA $Yes �❑No ❑NA ❑Yes ❑No ❑NA �❑Yes ❑No ❑NA <br /> [Was sensor property replaced and , 'Yes ❑No ❑NA )KYes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> 4 1 <br /> Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> I If the entire depth;of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />