Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br />been addressed for ESCALON MINI MART as of March 30, 2015. <br />Open violations from January 08, 2015 inspection <br />Violation #109 - Failed to test secondary containment. <br />The most recent secondary containment testing results from December 19-20, 2012, indicated a failure at UDC 3/4 <br />and UDC 5/6. All secondary containment for the UST system must be tight. A permit was obtained from the EHD on <br />March 15, 2013 (SR0066337) to repair the aforementioned components. According to an email communication from <br />Franzen -Hill Corporation, dated April 17, 2013, a successful secondary containment test was conducted for the UDC <br />5/6 on March 25, 2013. No testing notification was provided to the EHD for testing conducted on March 25, 2013 anc <br />therefore its results were not accepted. Immediately have a properly licensed, trained, and certified contractor repair <br />replace the failed components in UDC 3/4 and UDC 5/6 under permit and inspection from the EHD. This is a repeat <br />violation, Class II. <br />Violation #110 - Failed to submit secondary containment test report within 30 days. <br />According to Franzen -Hill Corporation, a secondary containment testing was performed on March 25, 2013 and a tea <br />report was not submitted to the EHD. A copy of the test report must be submitted within 30 days of the test. <br />Immediately submit a copy of this test report to the EHD. This is a repeat violation, Class II. <br />Violation #301 - UST system is not operated to prevent unauthorized release, including spills and overfills. <br />The most recent secondary containment testing results from December 19-20, 2012 indicated a failure at UDC 3/4 a <br />UDC 5/6. All secondary containment for the UST system must be tight. A permit was obtained from the EHD on <br />March 15, 2013 (SR0066337) to repair the aforementioned components. According to an email communication from <br />Franzen -Hill Corporation, dated April 17, 2013, on March 25, 2013 a successful secondary containment test was <br />conducted for the under dispenser containment (UDC) 5/6 , however, some additional repairs are still necessary for i <br />failures in UDC 3/4. The underground storage tank system shall be operated to prevent unauthorized releases. <br />Immediately make all necessary repairs under permit and inspection from the EHD. This is a repeat violation, Class I <br />Violation #317 - Secondary containment not tight. <br />According to an email communication from Franzen -Hill Corporation, dated April 17, 2013, some additional repairs a <br />still necessary for the secondary containment testing failure in the UDC 3/4. All secondary containment for the UST <br />system must be tight. Immediately have a properly licensed, trained, and certified contractor repair or replace the <br />failed component under permit and inspection of the EHD. This is a repeat violation, Class II. <br />Open violations from January 09, 2014 inspection <br />Page 1 of 1 <br />