Laserfiche WebLink
0 ecos./ <br /> Page 5 of 8 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Spec) <br /> Test <br /> Equipment Used:Tape Measure Equipment Resolution: 1/16 in <br /> p <br /> UDC# 1-2 UDC#3-4 UDC#5-6 UDC#7-8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Steel Steel Steel Steel <br /> UDC Depth: 10 in 10 in 10 in 10 in <br /> Height from UDC Bottom to Top 0 in 0 in 0 in 0 in <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 0 in 0 in 0 in 0 in <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested 8„above prod.piping 8„ <br /> above prod.piping 8 above prod.piping 8”above prod.piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes[—]No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> product and water)?` <br /> Turbine shutdown response time ” See comments " See comments * See comments "See comments <br /> Is system programmed for fail- ❑ ❑ ® ❑ [—]No® ❑ ❑ ® ❑ <br /> safe shutdown? Yes No NA Yes NA Yes No NA ❑Yes No NA <br /> Was fail-safe verified to be <br /> [:]Yes[—]No [:]No No®NA Yes No®NA Yes[:]No®NA [—]Yes❑No®NA <br /> Wait time between applying 5 min 5 min 5 min 5 min <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 9:45 AM 9:45 AM 9:45 AM 9:45 AM <br /> Initial Reading(Rj): 8 8 8 8 <br /> Test End Time: 10:45 AM 10:45 AM 10:45 AM 10:45 AM <br /> Final Reading(RF): 8 8 8 8 <br /> Test Duration: 60 min 60 min 60 min 60 min <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 1/16 in 1/16 in 1/16 in 1/16 in <br /> Test Result: Pass ❑Fail 0 Pass ❑Fail M Pass ❑Fail 0 Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> Was sensor properly replaced and yes NNA <br /> ❑1 <br /> verified functional after testing? ❑ ❑ o® es❑No®NA ❑Yes❑No®NA [:]Yes❑No®NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />