Laserfiche WebLink
0 0 ecov/ <br />Page 3 of 8 ECO-CHEK COMPLIANGE <br />5. SECONDARY PIPE TESTING <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />91 Secondary Pipe run failed due to leaks in Dispenser 5-6 penetration fitting. <br />••Meg <br />■ <br />■ • <br />aterial: <br />Fiberglass <br />Piping Manufacturer - <br />Piping <br />. <br />., <br />ProductPiping••._ <br />Method .•..•• <br />�: ... <br />... <br />Wait time • ; applying <br />pressure/vacuum/water and <br />startinTest <br />- <br />Start <br />■ <br />��■ <br />Initial Reading (Ri):Test <br />• <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold• <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />91 Secondary Pipe run failed due to leaks in Dispenser 5-6 penetration fitting. <br />