My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 3:19:01 PM
Creation date
6/3/2020 9:50:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rage 4 of 8 eco. <br />H <br />6- PI PING SIM" TF.STiNG <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Level Change Indicator <br />Equipment Resolution: 0.0025 <br />MMMEMMEff0Sump <br /># 1 (87) <br />Sump # 2 (91) <br />Sump # <br />Sump # <br />Sump Diameter: <br />38 in <br />38 in <br />Sump Depth: <br />67 in <br />62 in <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />8 on <br />8 in <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />8 in <br />9 in <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Portion of Sump Tested' <br />2" above prod. piping <br />2° above prod. piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?` <br />❑Yes [:]No ®NA <br />[-]Yes [-]No ®NA <br />Turbine shutdown response time <br />* See comments <br />* See comments <br />Is system programmed for fail-safe <br />shutdown?` <br />[:]Yes [:]No ®NA <br />❑Yes ❑No NA <br />Was fail-safe verified to be <br />operational?* <br />❑Z'es ❑No ®NA <br />❑Yes ❑No NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 min <br />5 min <br />Test Start Time: <br />11:00 AM <br />11:45 AM <br />Initial Reading (RI): <br />0 <br />0 <br />Test End Time: <br />11:30 AM <br />12:15 PM <br />Final Reading (RF): <br />0 <br />0 <br />Test Duration: <br />30 min <br />30 min <br />Change in Reading (RF -RI): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0.0025 <br />0.0025 <br />Test Result: <br />S. <br />Pass ❑ Fail <br />2 Pass ❑ Fail <br />❑ Pass' ❑ Fail <br />❑. Pas ❑ Fain <br />Was sensor removed for testing? <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Was sensor properly replaced and <br />verified fiznctional after testing?_ <br />®Yes [-]No [:INA <br />®Yes ❑No ❑NA <br />[-]Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />" Sump(s) sensor(s) were tested separately as part of the annual monitor certification test. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.