My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 3:19:01 PM
Creation date
6/3/2020 9:50:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, California 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjaov.org/ehd/unitiii.htmi <br />CONTINUATION FORM <br />Page: 3 of 4 <br />OFFICIAL INSPECTION REPORT <br />Date: 02/07/11 <br />Program: UST <br />Facility Address: Lathrop Shell 16500 South Harlan Road, Lathrop <br />SUMMARY OF VIOLATIONS <br />CLASS 1, CLASS II, or MINOR -Notice to Comply) <br />UST Inspection: Routine and annual Monitoring System Certification testing <br />7. Secondary containment test results from 06/03/08 and Monitoring System Certification, Leak Detector <br />and Spill Bucket test results from 11/09/09 were not found on site. These records shall be kept on site <br />for at least 3 years. All these tests were last performed by Epic Compliance Systems. Immediately locate <br />both test results and maintain the on site. <br />23c. The designated operator failed to check and note the correct test dates for the all required testing <br />on all monthly visual inspection reports since 04/29/10. Report for April - June 2010 documented <br />monitoring system certification and spill containment/ bucket test date as 10/07/09 and no date "no <br />records" for secondary containment testing. Reports for July - December 2010 documented monitoring <br />system certification and spill containment/ bucket test dates as 07/31/10 and no date "no records" for <br />secondary containment testing. Only a cold start of the monitoring panel was performed on 07/31/10 but <br />this is not a complete annual monitoring certification testing since it did not include leak detector and spill <br />bucket testing. During the monthly inspection, the designated operator shall check that all required <br />testing and maintenance for the UST system have been completed and document the dates they were <br />done. Ensure that designated operators performing monthly inspections at this facility are including all <br />of the required information on the reports. <br />23c. The February and March 2010 designated operator monthly inspection reports were not found on <br />site. Last designated operator monthly report from Epic Compliance was found for January 2010. <br />Franzen Hill monthly inspection reports begin in April 2010. Designated operator monthly inspection <br />reports for the previous twelve months shall be retained on site. Locate and ensure that copies of the <br />previous twelve months of designated operator monthly inspection reports are maintained on site. <br />Submit copies to the EHD by 02/28/11. <br />24. Test reports were not submitted within 30 days. Last monitoring system certification was completed <br />on 11/19/09. Leak detector and spill container testing were completed on 11/30/09. No test results were <br />received for the monitoring system certification test. Leak detector and spill container test results were <br />received by EHD on 01/28/10 - two months past due. Ensure all future test results are submitted within <br />30 days to testing to EHD. Submit a copy of the monitoring system certification test results from <br />11 /19/09 to E H D by 02/28/11. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE ($122). <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Insp tor: <br />Received By: 1 ) <br />Title: <br />EHD 23-02-003 Rev 08/10/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.