Laserfiche WebLink
ec(R� <br /> Page 3 of 8 <br /> cea-eaeewc�ranc:,eae€ <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run# 1 (87) Piping Run#2 (91) Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: AO Smith AO Smith <br /> Piping Diameter: 3 in 3 in <br /> Length of Piping Run: 85 feet 90 feet <br /> Product Stored: Gasoline Gasoline <br /> Method and location of 87 Sump Disp' 91 Sump Dis <br /> p'piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min ,red <br /> starting test: ENV <br /> = <br /> Test Start Time: 9:50 AM 9:50 AM <br /> Initial Reading(RI): 5 psi 5 psi <br /> Test End Time: 10:50 AM 10:50 AM <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 60 min 60 min <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or <br /> 5 psi 5 psi <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ❑ Pass ❑Fail ❑ Pass' ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />