My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 3:19:01 PM
Creation date
6/3/2020 9:50:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 1 0 ece� <br /> Page 4 of 8 <br /> ECiF-f3f€i€C3z.1atANCE <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used:Level Change Indicator Equipment Resolution:0.0025 <br /> Sump#1 (87) Sump#2(91) Sump# Sump# <br /> Sump Diameter: 38 in 38 in <br /> Sump Depth: 67 in 62 in <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 8 in 8 in <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> 8 in 9 in yr <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' 2"above prod.piping 2"above prod.piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No®NA ❑Yes❑No®NA <br /> product and water)?` N V <br /> Turbine shutdown response time *See comments See comments <br /> Is system programmed for fail-safe <br /> [:]Yes ❑ ❑ ® <br /> Yes❑No®NA Yes No NA <br /> Was fail-safe verified to be <br /> o erational?` ❑Yes❑No®NA [—]Yes❑No®NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min <br /> test: <br /> Test Start Time: 10:00 AM 10:35 AM <br /> Initial Reading(RI): 0 0 <br /> Test End Time: 10:30 AM 11:05 AM <br /> Final Reading(RF): 0 0 <br /> Test Duration: 30 min 30 min <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or Criteria: 0.0025 0.0025 <br /> Test Result: S Pass ❑Fail Z Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes❑No❑NA ❑Yes[]No❑NA []Yes❑No❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes❑No❑NA ®Yes❑No❑NA ❑Yes❑No[-INA ❑Yes❑No❑NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Sump(s)sensor(s)were tested separately as part of the annual monitor certification test. <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.