Laserfiche WebLink
A <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION 9 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mol. <br /> PLAN TYPE ONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moe. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME M03. <br /> FACILITY SITE ADDRESS M04. CITY Mos. <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Mo6. <br /> accordance with the equipment manufacturers'instructions,or annually, ichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): Mol. <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> MO TORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF ANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: R ❑ b.LIQUID FILLED L+y c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER: M12. MODEL#: M13. <br /> LEAK SENSOR MANUFACTURER: Ch �!„ Mla. MODEL#(S): MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: M18 MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): Mei. <br /> PROGRAMMED TESTS: ❑ a.0.1gP h. ❑ b.0.2 g.p.h. El c.c.OTHER(Specify): M22. M <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§26$3.1 <br /> TEST FREQUENCY: Era.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27. <br /> ❑ &VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ 99.OTHER(Specify): M29. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OPIPING SUMP(S)fFRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: DRY b.LIQUID FILLED mac.OUNDER PRESSURE ❑ d.UNDER31 <br /> R VACUUM M . <br /> PANEL MANUFACTURER: M32. MODEL#: 414 T- y&,= ` M33. <br /> LEAK SENSOR MANUFACTURER: U441 M34. MODEL#( M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES �0/o.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? Ela.YES U o.NO M37 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): M38. MODEL#(S): M39. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Moo. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY b.EVERY 3 YEARS ❑XOTHER(Specify) Mas. M46. <br /> S.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* WC.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> *Requires agency approval **Allowed for nronitoring of unburied emergency generator fuel piping only per HSC§25281.5(6)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) Mas. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />