My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Containment Installation Instructions <br /> 11,�; { IN-01 „, <br /> The washer head bolts and threaded inserts re- tings,such as sleeve couplings, are used in the con- <br /> quired for assembling the fittings are supplied, with tainment piping,do not use filler. Refer to Manual <br /> the inserts mounted in the fittings. One exception: No. F6000 for primary systems when installing joints <br /> laterals are supplied with nuts, bolts, and washers, with matching tapers. <br /> because the parts are not mirror-image. Two types of These piping systems are recommended for corro- <br /> adhesive are available for assembly. Both types of ad- sion services over a broad pH range. Consider the <br /> hesive require filler kits containing pre-weighed chemical recommendations for both RED THREAD II <br /> amounts of filler to increase the viscosity of the (epoxy pipe) and POLY THREAD (vinyl ester fittings) <br /> mixed adhesive when used with two-piece fittings. for a conservative evaluation. Refer to Bulletin No. <br /> Systems joined with DS-7014 or DS-7069 adhesive E5615 for chemical resistance/operating temperature <br /> are rated to 150"F maximum operating temperature. recommendations. Contact Smith Fiberglass <br /> Systems joined with DS-8014 or DS-8069 adhesive Products Inc. when necessary for a more detailed rec- <br /> are rated to 200"F. Note: When standard primary fit- ommendation. <br /> SECTION 1 Table 1 Number of Bolt"'Holes in Containment Fittings <br /> Secondary Containment Piping Components Size 45' 90' Concentric Short <br /> (In.) Elbow Elbow Tee Lateral Reducer Coupling Coupling <br /> A. Containment Piping-Secondary containment 3 9 10 11 13 - 10 6 <br /> piping sizes are as follows: 4 9 10 11 13 6 10 6 <br /> 6 9 10 11 14 8 10 8 <br /> 8 15 17 19 16 10 14 8 <br /> 10 19 21 27 32 8 12 8 <br /> Minimum Minimum 12 25 29 38 42 10 12 8 <br /> Primary Containment Containment 14 26 30 39 50 18 14 8 <br /> Piping Piping Size(In.) Piping Size(In.) 16 26 31 39 54 18 14 8 <br /> Size(In.) RT II,GT,PT CT <br /> 2 3* 3* Note: Some standard primary fittings such as sad- <br /> a 4* 4* dles,tapered sleeve couplings, etc., may be used <br /> with containment piping systems. <br /> 4 6* 6* <br /> 6 8 10 Refer to Tables 1 and 2 for bolt hole and dimen- <br /> 8 10 12 sional data. <br /> 10 12 14 <br /> 12 14 16 C. Adhesive for Secondary Containment <br /> 14 16 - Piping-For systems rated to 200"F, use DS-8014 or <br /> DS-8069 adhesive and filler. For systems rated to <br /> RT II = RED THREAD II PT = POLY THREAD 150"F, use DS-7014 or DS-7069 adhesive and filler. <br /> GT = GREEN THREAD CT = CHEM THREAD <br /> Secondary containment Fitting and pipe joints re- <br /> quire filler, which must be obtained from Smith <br /> Fiberglass Products Inc. Because of the quantity of <br /> B. Containment Fittings-Secondary containment adhesive required for secondary containment fit- <br /> fittings and components are as follows: tings, fillers are supplied for the standard (DS- <br /> Component Use 8014 and DS-7014) and large (DS-8069 and DS- <br /> 7069) size adhesive kits only. <br /> 45'elbow contain primary 45'elbow <br /> 90"elbow contain primary 90'elbow <br /> tee contain primary tee <br /> coupling contain primary coupling <br /> lateral contain primary lateral <br /> concentric reducer contain primary concentric <br /> reducer <br /> termination fitting terminate containment on <br /> primary pipe <br /> anchor assembly anchor primary to *When using 2",3",or 4"sweep fittings,use containment pipe and fittings <br /> containment pipe that are two diameter sizes larger than the primary. <br /> centralizer support primary pipe in Bolt sizes: 3"-6" Secondary Containment=1/4-20 x 3/4" <br /> containment 8"-16" Secondary Containment=5/16-18x 1-1/4" <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.